Alfa Laval Inc.: OSHA inspections and violations

Henrico, Virginia · Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing · NAICS 333415

9inspections
43citation items
$43,876current penalties
Sep 15, 2022last inspection

OSHA has inspected Alfa Laval Inc. 9 times in Virginia since 2004.

The latest one began on Sep 15, 2022 as a planned inspection, in Richmond.

Those inspections ended with 43 citation items: 34 serious and 9 other-than-serious.

Penalties were first proposed at $60,765 and now stand at $43,876, 28% lower after settlements or reviews.

Hazard communication comes up most often in these citations: 6 items under 1910.1200.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Alfa Laval Inc. averages $25,036 (1 cited inspection).

Alfa Laval Inc. also files yearly injury logs with OSHA, summarized below.

Alfa Laval Inc.: OSHA citation items per year, 2004 to 2022
Citation items per year, by inspection date.

Virginia · latest 90 days of OSHA records

248employers cited

Get notified the morning OSHA posts each new citation in Virginia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Virginia

Checking a subcontractor, a client or your own company? Watch Alfa Laval Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Company-wide record

OSHA records show Alfa Laval Inc. at 6 sites in 3 states. Together they've had 22 inspections and $572,686 in current penalties.

We match records by employer name and industry, so these sites are likely the same company, not certainly. Franchises and subsidiaries can file under one name.

Included with any plan: the site-by-site record for all 6 sites, with repeat and willful violations and citations per year for the whole company. Already a subscriber? Sign in.

See plans

Inspection history

Inspection 346224629 OPENED SEP 15, 2022Closed

Planned · Complete · Safety · 417 employees at the site · Closed Jun 29, 2023

5400 International Trade Drive, Richmond, VA 23231 · Power Boiler and Heat Exchanger Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 40.1-51.1.A
Serious$8,185$5,730Mar 9, 2023Final
Citation 1, item 3
29 CFR 1910.212(a)(1) · Machine guarding
Serious$6,895$4,826Mar 9, 2023Final
Citation 1, item 4
29 CFR 1910.212(b) · Machine guarding
Serious$6,895$4,826Mar 9, 2023Final
Citation 1, item 5a
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$6,895$4,826Mar 9, 2023Final
Citation 1, item 5b
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$0$0Mar 9, 2023Final
Citation 1, item 5c
29 CFR 1910.215(d)(3) · Grinders and abrasive wheels
Serious$0$0Mar 9, 2023Final
Citation 1, item 6a
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$6,895$4,826Mar 9, 2023Final
Citation 1, item 6b
29 CFR 1910.303(f)(2) · Electrical equipment, general requirements
Serious$0$0Mar 9, 2023Final

Inspection 342681673 OPENED OCT 4, 2017Closed

Planned · Complete · Health · 250 employees at the site · Closed Nov 27, 2017

5400 International Trade Drive, Richmond, VA 23231 · All Other Miscellaneous General Purpose Machinery Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 315459636 OPENED MAR 10, 2011Closed

Planned · Complete · Safety · 221 employees at the site · Closed Jun 9, 2011

5400 International Trade Dr., Henrico, VA 23231 · Power Boiler and Heat Exchanger Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.22(a)(1) · General requirements
Serious$2,100$1,470Apr 13, 2011Final
Citation 1, item 1b
29 CFR 1910.305(e)(1) · Electrical wiring methods
Serious$0$0Apr 13, 2011Final
Citation 1, item 2
29 CFR 1910.107(e)(5) · Spray painting and finishing
Serious$1,575$1,102Apr 13, 2011Final
Citation 1, item 3a
29 CFR 1910.178(a)(6) · Forklifts and other powered industrial trucks
Serious$1,575$1,102Apr 13, 2011Closed
Citation 1, item 3b
29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks
Serious$0$0Apr 13, 2011Final
Citation 1, item 3c
29 CFR 1910.178(q)(7) · Forklifts and other powered industrial trucks
Serious$0$0Apr 13, 2011Final
Citation 1, item 4
29 CFR 1910.179(n)(4)(i) · Overhead and gantry cranes
Serious$1,575$1,102Apr 13, 2011Final
Citation 1, item 5
29 CFR 1910.212(b) · Machine guarding
Serious$1,575$1,102Apr 13, 2011Final
Citation 2, item 1
29 CFR 1910.157(c)(1) · Portable fire extinguishers
Other-than-serious$0$0Apr 13, 2011Final
Citation 2, item 2
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Other-than-serious$0$0Apr 13, 2011Final

Inspection 311700652 OPENED DEC 13, 2007Closed

Referral · Partial · Safety · 30 employees at the site · Closed Jun 25, 2008

3944 Holland Boulevard, Chesapeake, VA 23323 · Other Electronic and Precision Equipment Repair and Maintenance · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$1,625$975Apr 15, 2008Closed

Inspection 311562508 OPENED OCT 30, 2007Closed

Planned · Complete · Health · 30 employees at the site · Closed Feb 5, 2008

3944 Holland Blvd, Chesapeake, VA 23323 · Other Electronic and Precision Equipment Repair and Maintenance · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$1,125$675Jan 22, 2008Closed
Citation 1, item 1b
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Jan 22, 2008Closed
Citation 1, item 1c
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$0$0Jan 22, 2008Closed
Citation 1, item 2
29 CFR 1910.151(c) · First aid and eyewash
Serious$1,125$675Jan 22, 2008Closed
Citation 1, item 3
29 CFR 1910.254(d)(9)(iii) · Arc welding and cutting
Serious$1,125$675Jan 22, 2008Closed
Citation 1, item 4a
29 CFR 1910.1200(e)(1)(ii) · Hazard communication
Serious$1,125$675Jan 22, 2008Closed
Citation 1, item 4b
29 CFR 1910.1200(f)(5)(i) · Hazard communication
Serious$0$0Jan 22, 2008Closed
Citation 1, item 4c
29 CFR 1910.1200(f)(5)(ii) · Hazard communication
Serious$0$0Jan 22, 2008Closed
Citation 1, item 4d
29 CFR 1910.1200(g)(8) · Hazard communication
Serious$0$0Jan 22, 2008Closed
Citation 2, item 1
29 CFR 1910.125(f)(3) · Additional requirements for dipping and coating operations that use flammable liquids or liquids with flashpoints greater than 199.4 °F (93 °C)
Other-than-serious$0$0Jan 22, 2008Closed
Citation 2, item 2
29 CFR 1910.134(e)(2)(i) · Respiratory protection
Other-than-serious$0$0Jan 22, 2008Closed
Citation 2, item 3
29 CFR 1910.146(c)(1) · Permit-required confined spaces
Other-than-serious$0$0Jan 22, 2008Closed
Citation 2, item 4
29 CFR 1910.178(g)(2) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Jan 22, 2008Closed

Inspection 310947304 OPENED MAR 28, 2007Closed

Planned · No inspection · Health · Closed Mar 28, 2007

4405 Cox Road, Suite 130, Glen Allen, VA 23060 · Industrial Machinery Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 309547487 OPENED JAN 26, 2006Closed

Planned · Partial · Safety · 225 employees at the site · Closed Feb 22, 2006

5400 International Trade Dr., Henrico, VA 23231 · Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.217(c)(1)(i) · Mechanical power presses
Serious$2,975$1,785Jan 30, 2006Closed
Citation 1, item 1b
29 CFR 1910.217(g)(1) · Mechanical power presses
Serious$0$0Jan 30, 2006Closed

Inspection 308285048 OPENED DEC 3, 2004Closed

Planned · Complete · Health · 230 employees at the site · Closed Mar 3, 2005

5400 International Trade Dr., Henrico, VA 23231 · Industrial Machinery Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(a)(2) · Guarding floor and wall openings and holes
Serious$1,500$1,500Jan 10, 2005Closed
Citation 1, item 2
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$1,500$1,500Jan 10, 2005Closed
Citation 1, item 3
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$1,500$1,500Jan 10, 2005Closed
Citation 1, item 4
29 CFR 1910.147(c)(4)(ii) · Lockout/tagout
Serious$1,500$1,500Jan 10, 2005Closed
Citation 1, item 5a
29 CFR 1910.1200(e)(1)(ii) · Hazard communication
Serious$1,500$1,500Jan 10, 2005Closed
Citation 1, item 5b
29 CFR 1910.1200(h)(3)(ii) · Hazard communication
Serious$0$0Jan 10, 2005Closed
Citation 2, item 1
29 CFR 1910.22(a)(1) · General requirements
Other-than-serious$0$0Jan 10, 2005Closed
Citation 2, item 2
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Other-than-serious$0$0Jan 10, 2005Closed
Citation 2, item 3
29 CFR 1910.134(d)(1)(iii) · Respiratory protection
Other-than-serious$0$0Jan 10, 2005Closed
1 older inspection

Inspection 307174664 OPENED APR 1, 2004Closed

Planned · No inspection · Health · Closed Apr 1, 2004

4405 Cox Road, Suite 130, Glen Allen, VA 23060 · Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Richmond site logged 9 recordable injuries or illnesses among about 532 workers: 1.5 per 100 full-time workers, against a median of 2.8 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Alfa Laval
Richmond · 2025
532 901.52.8
Alfa Laval Inc. Chesapeake (loc code: VACHES)
Chesapeake · 2025
24 000.01.5
Richmond site
Richmond · 2018
300 1250.42.8
Chesapeake site
Chesapeake · 2018
32 000.01.5
Hutchinson Hayes
Richmond · 2018
21 000.01.9

Included with any plan: 1 more yearly log from these sites, back to 2018, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.107(e)(5)

(5) Spraying containers. Containers supplying spray nozzles shall be of closed type or provided with metal covers kept closed. Containers not resting on floors shall be on metal supports or suspended by wire cables. Containers supplying spray nozzles by gravity flow shall not exceed 10 gallons capacity. Original shipping containers shall not be subject to air pressure for supplying spray nozzles. Containers under air pressure supplying spray nozzles shall be of limited capacity, not exceeding that necessary for 1 day's operation; shall be designed and approved for such use; shall be provided with a visible pressure gage; and shall be provided with a relief valve set to operate in conformance with the requirements of the Code for Unfired Pressure Vessels, Section VIII of the ASME Boiler and Pressure Vessel Code—1968, which is incorporated by reference as specified in § 1910.6. Containers

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.125 · Additional requirements for dipping and coating operations that use flammable liquids or liquids with flashpoints greater than 199.4 °F (93 °C)

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.151 · First aid and eyewash

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.179 · Overhead and gantry cranes

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.217 · Mechanical power presses

29 CFR 1910.22 · General requirements

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.254 · Arc welding and cutting

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

Other air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment manufacturing employers in Virginia

Alert subscribers get notified of each newly cited employer in Virginia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.