Army Corps of Engineers, John Day Dam: OSHA inspections and violations
Rufus, Oregon · Hydroelectric Power Generation · NAICS 221111
12inspections
46citation items
$0current penalties
Feb 21, 2023last inspection
Army Corps of Engineers, John Day Dam has 12 OSHA inspections on record in Oregon, the first in 2013.
OSHA's last visit started on Feb 21, 2023 after a complaint, in Rufus.
Across those inspections OSHA issued 46 citation items: 31 serious, 10 repeat and 5 other-than-serious.
OSHA did not attach a penalty to any of these citations.
Most often, OSHA cited 1910.305, electrical wiring methods (5 items).
For context, across all utility employers the median penalty per cited inspection since 2015 is $0. Army Corps of Engineers, John Day Dam averages $0 over 5 cited inspections in that time.
It reported 1 severe injury to OSHA since 2015.
Citation items per year, by inspection date.
Oregon · latest 90 days of OSHA records
372employers cited
Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch Army Corps of Engineers, John Day Dam and get notified the morning OSHA posts a new citation for it.
Incident on Apr 17, 2017: Employee's arm is caught between equipment and sustains lace
At 4:15 p.m. on April 17, 2017, an employee was observing the movement of the gantry crane as he walked along the spillway while retracting an air hose on a reel. The employee didn't notice a stationary ladder that was attached to the spillway wall and the employee's arm got caught between the ladder railing and a gearbox cover. The employee's forearm was cut.
(7) Additional monitoring. Whenever there has been a production, process, control or personnel change which may result in new or additional exposure to lead, or whenever the employer has any other reason to suspect a change which may result in new or additional exposures to lead, additional monitoring in accordance with this paragraph shall be conducted.
29 CFR 1910.1025(e)(3)(ii)
(ii) Written plans for these compliance programs shall include at least the following:
29 CFR 1910.1025(e)(4)(i)
(4) Mechanical ventilation. (i) When ventilation is used to control exposure, measurements which demonstrate the effectiveness of the system in controlling exposure, such as capture velocity, duct velocity, or static pressure shall be made at least every 3 months. Measurements of the system's effectiveness in controlling exposure shall be made within 5 days of any change in production, process, or control which might result in a change in employee exposure to lead.
Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.