OSHA SearchOSHA records by employer

Cabinet Renew LLC: OSHA inspections and violations

Sarasota, Florida · Wood Kitchen Cabinet and Countertop Manufacturing · NAICS 337110

1inspections
10citation items
$11,609current penalties
Oct 19, 2023last inspection

OSHA has inspected Cabinet Renew LLC once in Florida.

The inspection began on Oct 19, 2023 after a complaint, in Sarasota.

That inspection ended with 10 citation items: 8 serious and 2 other-than-serious.

Penalties were first proposed at $23,218 and now stand at $11,609, 50% lower after settlements or reviews.

Spray painting and finishing comes up most often in these citations: 5 items under 1910.107.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Cabinet Renew LLC averages $11,609 (1 cited inspection).

Cabinet Renew LLC: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

326employers cited

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Cabinet Renew LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347045221 OPENED OCT 19, 2023Closed

Complaint · Partial · Safety · 3 employees at the site · Closed Jun 11, 2025

1629, 1635 West University Parkway, Sarasota, FL 34243 · Wood Kitchen Cabinet and Countertop Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(b)(1) · Spray painting and finishing
Serious$3,572$1,786Oct 31, 2023Final
Citation 1, item 2
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$3,572$1,786Oct 31, 2023Final
Citation 1, item 3
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$3,572$1,786Oct 31, 2023Final
Citation 1, item 4
29 CFR 1910.107(c)(5) · Spray painting and finishing
Serious$3,572$1,786Oct 31, 2023Final
Citation 1, item 5
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$3,572$1,786Oct 31, 2023Final
Citation 1, item 6a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$5,358$2,679Oct 31, 2023Final
Citation 1, item 6b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Oct 31, 2023Final
Citation 1, item 6c
29 CFR 1910.134(f)(1) · Respiratory protection
Serious$0$0Oct 31, 2023Final
Citation 2, item 1
29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods
Other-than-serious$0$0Oct 31, 2023Final
Citation 2, item 2
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Oct 31, 2023Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(1)

(b) Spray booths—(1) Construction. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths shall be designed to sweep air currents toward the exhaust outlet.

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(5)(iv)

(iv) Space within the spray booth on the downstream and upstream sides of filters shall be protected with approved automatic sprinklers.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.305 · Electrical wiring methods

Other wood kitchen cabinet and countertop manufacturing employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.