OSHA SearchOSHA records by employer

Cutting Edge Fabrication, Inc.: OSHA inspections and violations

Gastonia, North Carolina · Sheet Metal Work Manufacturing · NAICS 332322

4inspections
34citation items
$4,390current penalties
Aug 27, 2019last inspection

Since 2008, OSHA inspectors have visited Cutting Edge Fabrication, Inc. in North Carolina 4 times.

The most recent inspection opened on Aug 27, 2019 after a complaint, in Gastonia and is still open.

In all, OSHA issued 34 citation items: 14 serious and 20 other-than-serious.

The proposed penalties came to $6,950; today they stand at $4,390, 37% less.

The rule cited most here is 1910.134 (respiratory protection), 4 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. Cutting Edge Fabrication, Inc. averages $2,145 across 2 cited inspections.

Cutting Edge Fabrication, Inc.: OSHA citation items per year, 2008 to 2019
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

234employers cited

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Cutting Edge Fabrication, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344264056 OPENED AUG 27, 2019Open

Complaint · Partial · Safety · 14 employees at the site · Open

1980 Chespark Drive, Gastonia, NC 28052 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$600$390Oct 22, 2019Final
Citation 1, item 1b Serious$0$0Oct 22, 2019Final
Citation 1, item 1c Serious$0$0Oct 22, 2019Final
Citation 1, item 2
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$1,000$650Oct 22, 2019Final
Citation 1, item 3
29 CFR 1910.219(f)(3) · Belts, pulleys and power-transmission parts
Serious$1,000$650Oct 22, 2019Final

Inspection 341307395 OPENED FEB 22, 2016Closed

Referral · Partial · Health · 10 employees at the site · Closed Aug 24, 2017

1980 Chespark Dr., Gastonia, NC 28052 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.850(a) · Preparatory operations
Serious$1,000$650Apr 18, 2016Final
Citation 1, item 1b
29 CFR 1926.850(b) · Preparatory operations
Serious$0$0Apr 18, 2016Final
Citation 1, item 2a
29 CFR 1926.501(a)(2) · Fall protection in construction
Serious$1,000$650Apr 18, 2016Final
Citation 1, item 2b
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$0$0Apr 18, 2016Final
Citation 1, item 3a
29 CFR 1926.502(a)(2) · Fall protection systems
Serious$1,000$650Apr 18, 2016Final
Citation 1, item 3b
29 CFR 1926.502(h)(1) · Fall protection systems
Serious$0$0Apr 18, 2016Final
Citation 1, item 4a
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$1,000$650Apr 18, 2016Final
Citation 1, item 4b
29 CFR 1926.503(b)(1) · Fall protection training in construction
Serious$0$0Apr 18, 2016Final

Inspection 315434993 OPENED FEB 17, 2011Closed

Planned · Complete · Health · 9 employees at the site · Closed Apr 11, 2012

1980 Chespark Dr., Gastonia, NC 28052 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Other-than-serious$100$0Apr 28, 2011Closed
Citation 1, item 2
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$250$100Apr 28, 2011Closed
Citation 2, item 1
29 CFR 1910.22(d)(1) · General requirements
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 2
29 CFR 1910.110(h)(12) · Storage and handling of liquefied petroleum gases
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 3
29 CFR 1910.134(d)(1)(ii) · Respiratory protection
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 4
29 CFR 1910.134(e)(1) · Respiratory protection
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 5
29 CFR 1910.134(f)(2) · Respiratory protection
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 6
29 CFR 1910.134(k)(3) · Respiratory protection
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 7
29 CFR 1910.147(c)(4)(ii) · Lockout/tagout
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 8
29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 9
29 CFR 1910.303(f)(2) · Electrical equipment, general requirements
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 10
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 11
29 CFR 1910.334(a)(2)(ii) · Using electrical equipment
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 12
29 CFR 1910.1200(e)(1)(i) · Hazard communication
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 13
29 CFR 1910.1200(f)(5)(i) · Hazard communication
Other-than-serious$0$0Apr 28, 2011Closed
Citation 2, item 14
29 CFR 1910.1200(f)(5)(ii) · Hazard communication
Other-than-serious$0$0Apr 28, 2011Closed

Inspection 312511942 OPENED JUL 23, 2008Closed

Planned · Complete · Health · 10 employees at the site · Closed Oct 1, 2008

1980 Chespark Drive, Gastonia, NC 28052 · Machine Shops · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Other-than-serious$0$0Aug 13, 2008Closed
Citation 1, item 2
29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Aug 13, 2008Closed
Citation 1, item 3
29 CFR 1910.178(q)(7) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Aug 13, 2008Closed
Citation 1, item 4
29 CFR 1910.212(a)(1) · Machine guarding
Other-than-serious$0$0Aug 13, 2008Closed
Citation 1, item 5
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Aug 13, 2008Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.110 · Storage and handling of liquefied petroleum gases

29 CFR 1910.110(h)(12)

(h) Liquefied petroleum gas service stations—(1) Application. This paragraph applies to storage containers, and dispensing devices, and pertinent equipment in service stations where LP-Gas is stored and is dispensed into fuel tanks of motor vehicles. See paragraph (e) of this section for requirements covering use of LP-Gas as a motor fuel. All requirements of paragraph (b) of this section apply to this paragraph unless otherwise noted.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.184 · Slings

29 CFR 1910.212 · Machine guarding

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.22 · General requirements

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.334 · Using electrical equipment

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.503 · Fall protection training in construction

29 CFR 1926.850 · Preparatory operations

Other sheet metal work manufacturing employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.