OSHA SearchOSHA records by employer

FPM Heat Treating, Inc.: OSHA inspections and violations

Elk Grove Village, Illinois · Metal Heat Treating · NAICS 332811

9inspections
33citation items
$35,840current penalties
Dec 13, 2022last inspection

OSHA has inspected FPM Heat Treating, Inc. 9 times in Illinois since 1985.

The latest one began on Dec 13, 2022 on a referral, in Elk Grove Village.

Those inspections ended with 33 citation items: 20 serious and 13 other-than-serious.

Penalties were first proposed at $54,462 and now stand at $35,840, 34% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 5 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and FPM Heat Treating, Inc. averages $14,000 (1 cited inspection).

FPM Heat Treating, Inc. also files yearly injury logs with OSHA, summarized below.

It reported 1 severe injury to OSHA since 2015.

FPM Heat Treating, Inc.: OSHA citation items per year, 1985 to 2022
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

416employers cited

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch FPM Heat Treating, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346388747 OPENED DEC 13, 2022Closed

Referral · Partial · Safety · 123 employees at the site · Closed Apr 18, 2023

1501 S. Lively Blvd., Elk Grove Village, IL 60007 · Metal Heat Treating · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$10,046$7,000Feb 21, 2023Final
Citation 1, item 2
29 CFR 1910.335(a)(1)(i) · Safeguards for personnel protection
Serious$10,046$7,000Feb 21, 2023Final

Inspection 343573929 OPENED NOV 1, 2018Closed

Referral · Partial · Safety · 70 employees at the site · Closed Mar 4, 2019

648 Highway 20, Cherry Valley, IL 61016 · Metal Heat Treating · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 315508820 OPENED APR 28, 2011Closed

Referral · Partial · Safety · 95 employees at the site · Closed Jun 15, 2011

1501 S Lively Blvd, Elk Grove Village, IL 60007 · Metal Heat Treating · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$6,300$6,300May 26, 2011Closed

Inspection 311247480 OPENED DEC 19, 2007Closed

Complaint · Partial · Health · 52 employees at the site · Closed Jan 31, 2008

648 U.s. Route 20, Cherry Valley, IL 61016 · Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$975$682Jan 4, 2008Closed
Citation 1, item 1b
29 CFR 1910.23(e)(1) · Guarding floor and wall openings and holes
Serious$0$0Jan 4, 2008Closed
Citation 1, item 2
29 CFR 1910.219(f)(3) · Belts, pulleys and power-transmission parts
Serious$1,625$1,138Jan 4, 2008Closed
Citation 2, item 1
29 CFR 1910.1200(f)(5)(i) · Hazard communication
Other-than-serious$0$0Jan 4, 2008Closed

Inspection 308732932 OPENED APR 26, 2005Closed

Referral · Partial · Safety · 96 employees at the site · Closed Sep 14, 2005

1501 S. Lively Blvd., Elk Grove Village, IL 60007 · Metal Heat Treating · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.146(c)(2) · Permit-required confined spaces
Serious$4,000$2,000Jun 24, 2005Closed
Citation 1, item 2
29 CFR 1910.146(d)(5)(i) · Permit-required confined spaces
Serious$4,000$2,000Jun 24, 2005Closed
Citation 1, item 3
29 CFR 1910.146(e)(1) · Permit-required confined spaces
Serious$4,000$2,000Jun 24, 2005Closed
Citation 1, item 4
29 CFR 1910.147(c)(5)(i) · Lockout/tagout
Serious$2,000$1,000Jun 24, 2005Closed
Citation 1, item 5
29 CFR 1910.147(c)(5)(iid) · Lockout/tagout
Serious$2,000$1,000Jun 24, 2005Closed
Citation 1, item 6
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$2,000$1,000Jun 24, 2005Closed
Citation 1, item 7
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$2,000$1,000Jun 24, 2005Closed
Citation 2, item 1a
29 CFR 1904.32(b)(3) · Yearly injury summary
Other-than-serious$800$400Jun 24, 2005Closed
Citation 2, item 1b
29 CFR 1904.32(b)(6) · Yearly injury summary
Other-than-serious$0$0Jun 24, 2005Closed
Citation 2, item 2
29 CFR 1904.33(a) · Retention and updating
Other-than-serious$800$400Jun 24, 2005Closed
Citation 2, item 3
29 CFR 1910.134(c)(2)(i) · Respiratory protection
Other-than-serious$0$0Jun 24, 2005Closed

Inspection 303152433 OPENED DEC 1, 1999Closed

Planned · No inspection · Health · 410 employees at the site · Closed Dec 22, 1999

1501 S. Lively Blvd., Elk Grove Village, IL 60007 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 102440401 OPENED DEC 8, 1992Closed

Planned · Complete · Safety · 150 employees at the site · Closed Jan 25, 1993

1501 S. Lively Blvd., Elk Grove Village, IL 60007 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks
Serious$1,400$1,000Dec 23, 1992Closed
Citation 1, item 2
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$1,750$1,200Dec 23, 1992Closed
Citation 2, item 1
29 CFR 1910.147(c)(4)(ii) · Lockout/tagout
Other-than-serious$0$0Dec 23, 1992Closed
Citation 2, item 2
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Other-than-serious$0$0Dec 23, 1992Closed
Citation 2, item 3
29 CFR 1910.303(f) · Electrical equipment, general requirements
Other-than-serious$0$0Dec 23, 1992Closed

Inspection 103332433 OPENED JUN 21, 1989Closed

Planned · Complete · Safety · 160 employees at the site · Closed Sep 1, 1989

1501 S. Lively Blvd., Elk Grove Village, IL 60007 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.38(a)(1) · Emergency action plans
Serious$180$180Jun 27, 1989Closed
Citation 1, item 1b
29 CFR 1910.157(g)(4) · Portable fire extinguishers
Serious$0$0Jun 27, 1989Closed
Citation 1, item 2a
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$240$240Jun 27, 1989Closed
Citation 1, item 2b
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$0$0Jun 27, 1989Closed
Citation 1, item 3
29 CFR 1910.304(f)(5)(v) · Grounding and circuit protection
Serious$240$240Jun 27, 1989Closed
Citation 2, item 1
29 CFR 1904.2(a) · Partial exemption for establishments in certain industries
Other-than-serious$60$60Jun 27, 1989Closed
Citation 2, item 2
29 CFR 1910.179(j)(2)(iii) · Overhead and gantry cranes
Other-than-serious$0$0Jun 27, 1989Closed
Citation 2, item 3
29 CFR 1910.179(j)(2)(iv) · Overhead and gantry cranes
Other-than-serious$0$0Jun 27, 1989Closed
Citation 2, item 4
29 CFR 1910.179(j)(3) · Overhead and gantry cranes
Other-than-serious$0$0Jun 27, 1989Closed
Citation 2, item 5
29 CFR 1910.179(m)(1) · Overhead and gantry cranes
Other-than-serious$0$0Jun 27, 1989Closed
1 older inspection

Inspection 100091842 OPENED NOV 1, 1985Closed

Planned · Records only · Safety · 102 employees at the site · Closed Nov 4, 1985

1501 S Lively Blvd, Elk Grove Village, IL 60007 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Elk Grove Village site logged 13 recordable injuries or illnesses among about 142 workers: 9.0 per 100 full-time workers, against a median of 3.2 for its industry. Those cases cost 4 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
FPM Heat Treating - Elk Grove Village
Elk Grove Village · 2025
142 1329.03.2
FPM Heat Treating - Cherry Valley
Cherry Valley · 2025
77 212.43.2
FPM Heat Treating, LLC - Elk Grove
Elk Grove Village · 2022
72 644.13.2
FPM Heat Treating, LLC - Cherry Valley
Cherry Valley · 2022
53 313.13.2
FPM Heat Treating LLC
Cherry Valley · 2019
48 000.03.2
Elk Grove
Elk Grove Village · 2017
102 423.03.2

Included with any plan: 6 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Dec 5, 2022, Elk Grove Village: Amputation · amputations · fingertip(s)

A temporary employee was cleaning up her work station at the end of her shift. She manually rotated the turntable platform of the spring-actuated pallet carousel skid positioner to bring a pair of pliers within reach. Her left middle fingertip became pinched between the tubular steel frame and the turntable platform resulting in amputation of the fingertip without bone loss.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.2 · Partial exemption for establishments in certain industries

29 CFR 1904.32 · Yearly injury summary

29 CFR 1904.32(b)(3)

(3) How do I certify the annual summary? A company executive must certify that he or she has examined the OSHA 300 Log and that he or she reasonably believes, based on his or her knowledge of the process by which the information was recorded, that the annual summary is correct and complete.

29 CFR 1904.32(b)(6)

(6) When do I have to post the annual summary? You must post the summary no later than February 1 of the year following the year covered by the records and keep the posting in place until April 30.

29 CFR 1904.33 · Retention and updating

29 CFR 1904.33(a)

(a) Basic requirement. You must save the OSHA 300 Log, the privacy case list (if one exists), the annual summary, and the OSHA 301 Incident Report forms for five (5) years following the end of the calendar year that these records cover.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.179 · Overhead and gantry cranes

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.332 · Training

29 CFR 1910.335 · Safeguards for personnel protection

29 CFR 1910.38 · Emergency action plans

Other metal heat treating employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.