OSHA SearchOSHA records by employer

Mods International Inc.: OSHA inspections and violations

Appleton, Wisconsin · Prefabricated Metal Building and Component Manufacturing · NAICS 332311

10inspections
63citation items
$384,276current penalties
Apr 16, 2024last inspection

Since 2014, OSHA inspectors have visited Mods International Inc. in Wisconsin 10 times.

The most recent inspection opened on Apr 16, 2024 to follow up on an earlier case, in Appleton.

In all, OSHA issued 63 citation items: 31 serious, 23 repeat and 9 other-than-serious.

The proposed penalties came to $392,899; today they stand at $384,276, 2% less.

The rule cited most here is 1910.1200 (hazard communication), 8 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. Mods International Inc. averages $47,484 across 8 cited inspections.

Mods International Inc.: OSHA citation items per year, 2014 to 2024
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

223employers cited

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Mods International Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347427908 OPENED APR 16, 2024Closed

Follow-up · Partial · Health · 6 employees at the site · Closed Sep 3, 2024

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347398703 OPENED APR 9, 2024Open

Follow-up · Partial · Safety · 6 employees at the site · Open

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.30(a)(1) · Training requirements
Repeat$6,914$6,914Sep 4, 2024Final
Citation 1, item 2
29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks
Repeat$6,914$6,914Sep 4, 2024Final
Citation 1, item 3a
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Repeat$6,914$6,914Sep 4, 2024Final
Citation 1, item 3b
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Repeat$0$0Sep 4, 2024Final

Inspection 347398729 OPENED APR 9, 2024Open

Follow-up · Partial · Health · 12 employees at the site · Open

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Repeat$25,353$25,353Sep 4, 2024Final
Citation 1, item 2a
29 CFR 1910.134(c)(1) · Respiratory protection
Repeat$10,141$10,141Sep 4, 2024Final
Citation 1, item 2b
29 CFR 1910.134(e)(1) · Respiratory protection
Repeat$0$0Sep 4, 2024Final
Citation 1, item 2c
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Repeat$0$0Sep 4, 2024Final
Citation 1, item 3
29 CFR 1910.1200(e)(1) · Hazard communication
Repeat$20,280$20,280Sep 4, 2024Final
Citation 1, item 4
29 CFR 1910.1200(h)(1) · Hazard communication
Repeat$20,280$20,280Sep 4, 2024Final
Citation 2, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$584$584Jan 17, 2025Final
Citation 2, item 2
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$584$584Jan 17, 2025Final

Inspection 344361662 OPENED OCT 7, 2019Closed

Complaint · Partial · Health · 20 employees at the site · Closed May 14, 2026

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$4,241$4,241Apr 3, 2020Final
Citation 1, item 1b Serious$0$0Apr 3, 2020Final
Citation 1, item 1c Serious$0$0Apr 3, 2020Final
Citation 1, item 2a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$4,241$4,241Apr 3, 2020Final
Citation 1, item 2b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Apr 3, 2020Final
Citation 1, item 2c
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Serious$0$0Apr 3, 2020Final
Citation 2, item 1
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Repeat$4,242$4,242Apr 3, 2020Final
Citation 2, item 2
29 CFR 1910.1200(e)(1) · Hazard communication
Repeat$16,964$16,964Apr 3, 2020Final
Citation 2, item 3
29 CFR 1910.1200(h)(1) · Hazard communication
Repeat$16,964$16,964Apr 3, 2020Final

Inspection 344362587 OPENED OCT 7, 2019Closed

Complaint · Partial · Safety · 20 employees at the site · Closed May 14, 2026

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.30(a)(1) · Training requirements
Serious$4,241$4,241Apr 3, 2020Final
Citation 1, item 2
29 CFR 1910.213(a)(9) · Woodworking machinery
Serious$4,241$4,241Apr 3, 2020Final
Citation 1, item 3a
29 CFR 1910.213(c)(1) · Woodworking machinery
Serious$4,241$4,241Apr 3, 2020Final
Citation 1, item 3b
29 CFR 1910.213(c)(2) · Woodworking machinery
Serious$0$0Apr 3, 2020Final
Citation 1, item 3c
29 CFR 1910.213(c)(3) · Woodworking machinery
Serious$0$0Apr 3, 2020Final
Citation 1, item 4a
29 CFR 1910.305(b)(1)(i) · Electrical wiring methods
Serious$4,241$4,241Apr 3, 2020Final
Citation 1, item 4b
29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods
Serious$0$0Apr 3, 2020Final
Citation 1, item 5
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$4,241$4,241Apr 3, 2020Final
Citation 2, item 1
29 CFR 1910.157(e)(3) · Portable fire extinguishers
Repeat$42,412$42,412Apr 3, 2020Final
Citation 2, item 2
29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks
Repeat$42,412$42,412Apr 3, 2020Final
Citation 2, item 3
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Repeat$42,412$42,412Apr 3, 2020Final
Citation 2, item 4
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Repeat$21,206$21,206Apr 3, 2020Final

Inspection 342185261 OPENED MAR 20, 2017Closed

Complaint · Partial · Safety · 25 employees at the site · Closed Jan 30, 2026

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.178(a)(4) · Forklifts and other powered industrial trucks
Serious$3,622$3,622Jun 16, 2017Final
Citation 1, item 2a
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$3,622$3,622Jun 16, 2017Final
Citation 1, item 2b
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$0$0Jun 16, 2017Final
Citation 2, item 1
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Repeat$7,243$7,243Jun 16, 2017Final
Citation 3, item 1a
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$406$406Sep 7, 2017Final
Citation 3, item 1b
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$0$0Sep 7, 2017Final

Inspection 342185394 OPENED MAR 20, 2017Closed

Follow-up · Partial · Safety · 25 employees at the site · Closed Jan 30, 2026

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Repeat$5,794$5,794Jun 16, 2017Final
Citation 1, item 2
29 CFR 1910.157(e)(3) · Portable fire extinguishers
Repeat$7,243$7,243Jun 16, 2017Final
Citation 1, item 3
29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks
Repeat$7,243$7,243Jun 16, 2017Final
Citation 1, item 4
29 CFR 1910.334(a)(2)(i) · Using electrical equipment
Repeat$7,243$7,243Jun 16, 2017Final
Citation 2, item 1a
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$406$406Sep 7, 2017Final
Citation 2, item 1b
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$0$0Sep 7, 2017Final

Inspection 342185527 OPENED MAR 20, 2017Closed

Complaint · Partial · Health · 25 employees at the site · Closed Jan 30, 2026

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$5,070$5,070Jun 16, 2017Final
Citation 1, item 1b Serious$0$0Jun 16, 2017Final
Citation 1, item 1c Serious$0$0Jun 16, 2017Final
Citation 1, item 2a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$2,897$2,897Jun 16, 2017Final
Citation 1, item 2b
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Jun 16, 2017Final
Citation 2, item 1
29 CFR 1910.1200(g)(8) · Hazard communication
Repeat$5,794$5,794Jun 16, 2017Final
Citation 3, item 1a
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$406$406Sep 8, 2017Final
Citation 3, item 1b
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$0$0Sep 8, 2017Final
2 older inspections

Inspection 341696987 OPENED AUG 16, 2016Closed

Complaint · Partial · Safety · 25 employees at the site · Closed Jan 30, 2026

5523 W Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$3,920$1,960Oct 25, 2016Final
Citation 1, item 2
29 CFR 1910.157(e)(3) · Portable fire extinguishers
Serious$2,352$1,176Oct 25, 2016Final
Citation 1, item 3a
29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks
Serious$3,920$1,960Oct 25, 2016Final
Citation 1, item 3b
29 CFR 1910.178(l)(6) · Forklifts and other powered industrial trucks
Serious$0$0Oct 25, 2016Final
Citation 1, item 4
29 CFR 1910.243(c)(4) · Guarding of portable powered tools
Serious$3,135$1,568Oct 25, 2016Final
Citation 1, item 5
29 CFR 1910.334(a)(2)(i) · Using electrical equipment
Serious$3,920$1,960Oct 25, 2016Final
Citation 2, item 1
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Other-than-serious$0$0Oct 25, 2016Final

Inspection 339881757 OPENED AUG 4, 2014Closed

Complaint · Partial · Health · 9 employees at the site · Closed Jan 30, 2026

5523 Integrity Way, Appleton, WI 54913 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(b)(1) · Spray painting and finishing
Serious$2,000$2,000Sep 30, 2014Final
Citation 1, item 2
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Serious$1,200$1,200Sep 30, 2014Final
Citation 1, item 3
29 CFR 1910.1200(g)(8) · Hazard communication
Serious$1,200$1,200Sep 30, 2014Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(1)

(b) Spray booths—(1) Construction. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths shall be designed to sweep air currents toward the exhaust outlet.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.243 · Guarding of portable powered tools

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.30 · Training requirements

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.334 · Using electrical equipment

29 CFR 1910.95 · Noise

Other prefabricated metal building and component manufacturing employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.