Inspection 347147373 OPENED DEC 6, 2023Open
4547 West Northbank Road, Buckeye Lake, OH 43008 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
Incident on Dec 4, 2023 (fatal): Employee falls from forklift forks while installing window,
At 2:30 p.m. on December 4, 2023, Employee # 1 was working for a residential general contractor. Employee #1 was installing a window. Employee #1 was standing with the window on an scaffold platform which was comprised of a 41 inch by 48 inch sheet of 3/4" thick plywood ratchet strapped to the forks of a forklift. The operator of the forklift was elevating the platform into position for Employee # 1 to install the window. Employee # 1 was stabilizing the window that was also resting on the platform. As the platform was being elevated into position, approximately 19.5 feet above ground level by the forklift, the window struck the overhang of the roof which caused the platform to bounce, flexing and breaking the window which threw the window and Employee # 1 off the platform approximately 19.5 feet to the ground. The fall to the ground resulted in fatal injuries which were blunt force injury to torso.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks |
Serious | $3,457 | $2,074 | Feb 22, 2024 | Final |
| Citation 1, item 2 29 CFR 1926.20(b)(1) · Construction safety programs |
Serious | $4,839 | $2,903 | Feb 22, 2024 | Final |
| Citation 1, item 3a 29 CFR 1926.451(c)(2)(iv) · Scaffolds, general requirements |
Serious | $4,839 | $2,903 | Feb 22, 2024 | Final |
| Citation 1, item 3b 29 CFR 1926.451(c)(2)(v) · Scaffolds, general requirements |
Serious | $0 | $0 | Feb 22, 2024 | Final |
| Citation 1, item 4 29 CFR 1926.451(f)(7) · Scaffolds, general requirements |
Serious | $4,839 | $2,903 | Feb 22, 2024 | Final |
| Citation 1, item 5 29 CFR 1926.451(g)(1) · Scaffolds, general requirements |
Serious | $4,839 | $2,903 | Feb 22, 2024 | Final |
| Citation 1, item 6 29 CFR 1926.454(a) · Scaffold training |
Serious | $4,839 | $2,903 | Feb 22, 2024 | Final |
| Citation 2, item 1 29 CFR 1904.39(a)(1) · Reporting deaths and severe injuries |
Other-than-serious | $3,457 | $2,074 | Feb 22, 2024 | Final |