OSHA SearchOSHA records by employer

Ocean Light Corporation: OSHA inspections and violations

Parris Island, South Carolina · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

5inspections
6citation items
$2,984current penalties
Nov 17, 2022last inspection

Ocean Light Corporation has 5 OSHA inspections on record in South Carolina, the first in 2002.

OSHA's last visit started on Nov 17, 2022 as a planned inspection, in Beaufort.

Across those inspections OSHA issued 6 citation items: 3 serious and 3 other-than-serious.

OSHA proposed $4,774 in penalties. After settlements and reviews the total is $2,984, down 37%.

Most often, OSHA cited 1926.405, job-site wiring (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Ocean Light Corporation averages $2,684 over 1 cited inspection in that time.

Ocean Light Corporation: OSHA citation items per year, 2002 to 2022
Citation items per year, by inspection date.

South Carolina · latest 90 days of OSHA records

41employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in South Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in South Carolina

Checking a subcontractor, a client or your own company? Watch Ocean Light Corporation and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346351372 OPENED NOV 17, 2022Closed

Planned · Complete · Safety · 2 employees at the site · Closed Jan 26, 2023

Building 729 Marine Corps Air Station, Beaufort, SC 29906 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(a)(2)(ii)(f) · Job-site wiring
Serious$2,237$1,342Jan 13, 2023Final
Citation 1, item 2
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$2,237$1,342Jan 13, 2023Final

Inspection 342937158 OPENED FEB 7, 2018Closed

Planned · Complete · Safety · 4 employees at the site · Closed Feb 20, 2018

Power Plant Guantanamo Street, Parris Island, SC 29905 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 301116752 OPENED MAY 6, 2004Closed

Planned · Complete · Safety · 3 employees at the site · Closed Nov 1, 2004

17 Wake Blvd., Parris Island, SC 29905 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 301116083 OPENED APR 9, 2003Closed

Unprogrammed other · Complete · Safety · 2 employees at the site · Closed Oct 20, 2003

Family Pools, Parris Island, SC 29905 · Other Building Equipment Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(13) · Ladders in construction
Other-than-serious$0$0Oct 8, 2003Closed

Inspection 303570519 OPENED APR 4, 2002Closed

Planned · Complete · Safety · 4 employees at the site · Closed May 9, 2002

474 Broad River Blvd, Beaufort, SC 29906 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$300$300Apr 22, 2002Closed
Citation 2, item 1
29 CFR 1926.404(b)(1)(ii) · Ground-fault protection on job sites
Other-than-serious$0$0Apr 22, 2002Closed
Citation 2, item 2
29 CFR 1926.1051(a) · Stairways and Ladders: general requirements
Other-than-serious$0$0Apr 22, 2002Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1051 · Stairways and Ladders: general requirements

29 CFR 1926.1051(a)

(a) A stairway or ladder shall be provided at all personnel points of access where there is a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist is provided.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(13)

(13) The top or top step of a stepladder shall not be used as a step.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(ii)

(ii) Ground-fault circuit interrupters. All 120-volt, single-phase, 15- and 20-ampere receptacle outlets on construction sites, which are not a part of the permanent wiring of the building or structure and which are in use by employees, shall have approved ground-fault circuit interrupters for personnel protection. Receptacles on a two-wire, single-phase portable or vehicle-mounted generator rated not more than 5kW, where the circuit conductors of the generator are insulated from the generator frame and all other grounded surfaces, need not be protected with ground-fault circuit interrupters.

29 CFR 1926.405 · Job-site wiring

Other electrical contractors and other wiring installation contractors employers in South Carolina

Alert subscribers get notified of each newly cited employer in South Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.