OSHA SearchOSHA records by employer

Samson Plastic Pipe, Inc: OSHA inspections and violations

Samson, Alabama · Plastics Pipe and Pipe Fitting Manufacturing · NAICS 326122

5inspections
22citation items
$1,965current penalties
May 10, 2023last inspection

Since 1993, OSHA inspectors have visited Samson Plastic Pipe, Inc in Alabama 5 times.

The most recent inspection opened on May 10, 2023 as a planned inspection, in Samson.

In all, OSHA issued 22 citation items: 3 serious and 19 other-than-serious.

The proposed penalties came to $6,074; today they stand at $1,965, 68% less.

The rule cited most here is 1910.95 (noise), 6 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Samson Plastic Pipe, Inc averages $788 across 2 cited inspections.

Samson Plastic Pipe, Inc: OSHA citation items per year, 1993 to 2023
Citation items per year, by inspection date.

Alabama · latest 90 days of OSHA records

100employers cited

Get notified the morning OSHA posts each new citation in Alabama: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Alabama

Checking a subcontractor, a client or your own company? Watch Samson Plastic Pipe, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346697501 OPENED MAY 10, 2023Closed

Planned · No inspection · Safety · 3 employees at the site · Closed Jun 14, 2023

100 Industrial Dr, Samson, AL 36477 · Plastics Pipe and Pipe Fitting Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 344148382 OPENED JUL 10, 2019Closed

Referral · Partial · Health · 6 employees at the site · Closed Nov 7, 2019

100 Industrial Dr, Samson, AL 36477 · Plastics Pipe and Pipe Fitting Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Other-than-serious$2,842$0Oct 3, 2019Final
Citation 1, item 1b Other-than-serious$0$0Oct 3, 2019Final
Citation 1, item 1c Other-than-serious$0$0Oct 3, 2019Final
Citation 1, item 1d Other-than-serious$0$0Oct 3, 2019Final
Citation 2, item 1 Other-than-serious$0$0Oct 3, 2019Final

Inspection 343960258 OPENED APR 29, 2019Closed

Complaint · Partial · Safety · 9 employees at the site · Closed Aug 13, 2020

100 Industrial Dr, Samson, AL 36477 · Plastics Pipe and Pipe Fitting Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$2,842$1,575Oct 3, 2019Final
Citation 2, item 1
29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Oct 3, 2019Final
Citation 2, item 2
29 CFR 1910.178(l)(6) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Oct 3, 2019Final

Inspection 109246074 OPENED AUG 18, 1993Closed

Follow-up · Partial · Health · 33 employees at the site · Closed Aug 18, 1993

100 Industrial Dr., Samson, AL 36477 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 107014904 OPENED APR 7, 1993Closed

Complaint · Partial · Health · 34 employees at the site · Closed Oct 29, 1993

100 Industrial Dr., Samson, AL 36477 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$390$390Jun 21, 1993Closed
Citation 1, item 1b
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$0$0Jun 21, 1993Closed
Citation 2, item 1
29 CFR 1904.2(a) · Partial exemption for establishments in certain industries
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 2
29 CFR 1910.23(a)(8) · Guarding floor and wall openings and holes
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 3 Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 4
29 CFR 1910.132(a) · Personal protective equipment, general requirements
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 5
29 CFR 1910.141(g)(2) · Sanitation
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 6
29 CFR 1910.157(c)(1) · Portable fire extinguishers
Other-than-serious$0$0Jun 24, 1993Closed
Citation 2, item 7
29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 8
29 CFR 1910.253(b)(2)(ii) · Gas welding and cutting
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 9a
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 9b
29 CFR 1910.1200(g)(5)(i) · Hazard communication
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 9c
29 CFR 1910.1200(f)(5)(ii) · Hazard communication
Other-than-serious$0$0Jun 21, 1993Closed
Citation 2, item 9d
29 CFR 1910.1200(h) · Hazard communication
Other-than-serious$0$0Jun 21, 1993Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.2 · Partial exemption for establishments in certain industries

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(f)(5)(ii)

(ii) The label for bulk shipments of hazardous chemicals must be on the immediate container, transmitted with the shipping papers or the bills of lading, or, with the agreement of the receiving entity, transmitted by technological or electronic means so that it is immediately available to workers in printed form on the receiving end of shipment.

29 CFR 1910.1200(g)(5)(i)

(5) The chemical manufacturer, importer or employer preparing the safety data sheet shall ensure that the information provided accurately reflects the scientific evidence used in making the hazard classification. If the chemical manufacturer, importer or employer preparing the safety data sheet becomes newly aware of any significant information regarding the hazards of a chemical, or ways to protect against the hazards, this new information shall be added to the safety data sheet within three months. If the chemical is not currently being produced or imported, the chemical manufacturer or importer shall add the information to the safety data sheet before the chemical is introduced into the workplace again.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.141 · Sanitation

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.95 · Noise

Other plastics pipe and pipe fitting manufacturing employers in Alabama

Alert subscribers get notified of each newly cited employer in Alabama the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.