Inspection 346312580 OPENED OCT 18, 2022Closed
Soccer Field Koblerville, Saipan, MP 96950 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Saipan, Northern Mariana Islands · Commercial and Institutional Building Construction · NAICS 236220
Since 1999, OSHA inspectors have visited USA Fanter Corp., Ltd. in Northern Mariana Islands 17 times.
The most recent inspection opened on Oct 18, 2022 as a planned inspection, in Saipan.
In all, OSHA issued 82 citation items: 61 serious, 6 repeat and 15 other-than-serious.
The proposed penalties came to $166,246; today they stand at $118,883, 28% less.
The rule cited most here is 1926.451 (scaffolds, general requirements), 9 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. USA Fanter Corp., Ltd. averages $13,767 across 5 cited inspections.
1 inspection on this page followed a fatal incident.
USA Fanter Corp., Ltd. also files yearly injury logs with OSHA, summarized below.
The Wage and Hour Division has 3 cases on it since 2015, with $14,329 in back wages owed to workers.
Northern Mariana Islands · latest 90 days of OSHA records
7employers cited
5 of them in the same industry
Get notified the morning OSHA posts each new citation in Northern Mariana Islands: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Northern Mariana Islands
Checking a subcontractor, a client or your own company? Watch USA Fanter Corp., Ltd. and get notified the morning OSHA posts a new citation for it.
Watch this companySoccer Field Koblerville, Saipan, MP 96950 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Corner Of Beach Rd. And Orchid St., Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Papak Beach, San Antonio Lift Station Wet Well A-16 South Of Pic Hotel, Saipan, MP 96950 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
Incident on Jul 7, 2017 (fatal): Three employees are asphyxiated by hydrogen sulfide gas
At 11:00 a.m. on July 7, 2017, Employee #1was attempting to dislodge a 24 inch rubber plug from a 2foot diameter sewer pipe located inside a 24foot deep wet well. The workers were outside the well pulling on a 1/4-inch nylon rope that was attached to the 24-inch diameter plug. The plug was lodged inside a T-shaped PVC fitting from the force of the waste water emptying into the well. Without conducting any atmospheric testing of the work space, Employee #1 climbed down the ladder with a crowbar to dislodge the deflated 24inch diameter rubber plug, which was about 8 feet below the top of the well. He had difficulty releasing the plug with the crowbar and started to make his way up the ladder. He lost consciousness when he was about 2 feet from the top of the well and fell into the 24 foot deep well. Employee #2 descended down the ladder to provide emergency rescue, but lost consciousness and went underwater. The waste water level was about 3 feet deep at this point. Employee #3 climbed down the ladder to provide emergency rescue, but lost consciousness as well. All three workers were asphyxiated by hydrogen sulfide (H2S) gas. sulfide (H2S) gas.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.1203(a) · Confined Spaces in Construction: general requirements |
Serious | $8,873 | $7,542 | Dec 18, 2017 | Final |
| Citation 1, item 1b 29 CFR 1926.1204(b) · Permit-required confined space program |
Serious | $0 | $0 | Dec 18, 2017 | Final |
| Citation 1, item 2 29 CFR 1926.1203(e)(2)(ii) · Confined Spaces in Construction: general requirements |
Serious | $6,338 | $5,387 | Dec 18, 2017 | Final |
| Citation 1, item 3 29 CFR 1926.1203(e)(2)(iii) · Confined Spaces in Construction: general requirements |
Serious | $8,873 | $7,542 | Dec 18, 2017 | Final |
| Citation 1, item 4 29 CFR 1926.1204(c)(4) · Permit-required confined space program |
Serious | $8,873 | $7,542 | Dec 18, 2017 | Final |
| Citation 1, item 5a 29 CFR 1926.1204(d)(8) · Permit-required confined space program |
Serious | $8,873 | $7,542 | Dec 18, 2017 | Final |
| Citation 1, item 5b 29 CFR 1926.1204(i) · Permit-required confined space program |
Serious | $0 | $0 | Dec 18, 2017 | Final |
| Citation 1, item 6 29 CFR 1926.1205(a) · Permitting process |
Serious | $8,873 | $7,542 | Dec 18, 2017 | Final |
| Citation 1, item 7a 29 CFR 1926.1207(a) · Training |
Serious | $8,873 | $7,542 | Dec 18, 2017 | Final |
| Citation 1, item 7b 29 CFR 1926.1207(c) · Training |
Serious | $0 | $0 | Dec 18, 2017 | Final |
Intersection Of Rte 30 (beach Rd.) And Kalachucha Ave. Garapan, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements |
Serious | $4,240 | $2,968 | Oct 14, 2016 | Final |
| Citation 2, item 1 29 CFR 1926.25(a) · Housekeeping |
Other-than-serious | $0 | $0 | Oct 14, 2016 | Final |
| Citation 2, item 2 29 CFR 1926.95(b) · Criteria for personal protective equipment |
Other-than-serious | $0 | $0 | Oct 14, 2016 | Final |
Grand Mariana Hotel, Casino Project, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1904.39(a)(2) · Reporting deaths and severe injuries |
Other-than-serious | $3,850 | $2,695 | Mar 29, 2016 | Final |
Proposed Qq Car Rental Beach Road, Garapan, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.102(a)(2) · Eye and face protection in construction |
Serious | $2,380 | $1,785 | Feb 22, 2016 | Final |
| Citation 1, item 2 29 CFR 1926.1053(b)(5)(i) · Ladders in construction |
Other-than-serious | $1,785 | $0 | Feb 22, 2016 | Final |
| Citation 2, item 1 29 CFR 1926.405(b)(1) · Job-site wiring |
Repeat | $4,200 | $4,200 | Feb 22, 2016 | Final |
Site Clearing For New Casino And Hotel Between The Fiesta And Hafa Adai Hotels, Beach Road, Village Of Garapan, Saipan, MP 96950 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 OSH Act Section 5(a)(1) · General Duty Clause |
Serious | $1,496 | $1,047 | May 29, 2015 | Final |
| Citation 1, item 2 29 CFR 1926.95(a) · Criteria for personal protective equipment |
Serious | $1,496 | $1,047 | May 29, 2015 | Final |
| Citation 1, item 3 29 CFR 1926.600(a)(3)(i) · Equipment |
Serious | $1,122 | $785 | May 29, 2015 | Final |
| Citation 1, item 4 29 CFR 1926.601(b)(14) · Motor vehicles |
Serious | $1,496 | $1,047 | May 29, 2015 | Final |
| Citation 1, item 5 29 CFR 1926.604(a)(2) · Site clearing |
Serious | $1,870 | $1,309 | May 29, 2015 | Final |
| Citation 1, item 6 29 CFR 1926.604(a)(2)(ii) · Site clearing |
Serious | $1,870 | $1,309 | May 29, 2015 | Final |
Commercial Building Construction Garapan Beach Rd Accross From Winchells, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(b)(1) · Scaffolds, general requirements |
Serious | $1,600 | $1,000 | Dec 31, 2013 | Final |
New Commercial Building For Qq Rental Car Beach Road, Village Of Garapan, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.20(b)(2) · Construction safety programs |
Serious | $5,390 | $3,000 | Dec 27, 2013 | Final |
| Citation 1, item 1b 29 CFR 1926.50(d)(1) · Medical services and first aid |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 2 29 CFR 1926.100(a) · Hard hats in construction |
Serious | $3,080 | $2,000 | Dec 27, 2013 | Final |
| Citation 1, item 3a 29 CFR 1926.403(b)(2) · Electrical equipment on job sites |
Serious | $3,850 | $2,000 | Dec 27, 2013 | Final |
| Citation 1, item 3b 29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 3c 29 CFR 1926.405(a)(2)(ii)(j) · Job-site wiring |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 3d 29 CFR 1926.416(e)(1) · Electrical safety in construction |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 4a 29 CFR 1926.451(b)(1) · Scaffolds, general requirements |
Serious | $4,620 | $2,200 | Dec 27, 2013 | Final |
| Citation 1, item 4b 29 CFR 1926.451(e)(6)(i) · Scaffolds, general requirements |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 4c 29 CFR 1926.451(e)(6)(ii) · Scaffolds, general requirements |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 4d 29 CFR 1926.451(e)(6)(vi) · Scaffolds, general requirements |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 5a 29 CFR 1926.451(f)(7) · Scaffolds, general requirements |
Serious | $3,080 | $2,000 | Dec 27, 2013 | Final |
| Citation 1, item 5b 29 CFR 1926.454(a) · Scaffold training |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 5c 29 CFR 1926.454(b) · Scaffold training |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 6 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $5,390 | $4,000 | Dec 27, 2013 | Final |
| Citation 1, item 7a 29 CFR 1926.1053(a)(2) · Ladders in construction |
Serious | $3,080 | $2,000 | Dec 27, 2013 | Final |
| Citation 1, item 7b 29 CFR 1926.1053(a)(3)(i) · Ladders in construction |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 1, item 8 29 CFR 1926.1053(b)(15) · Ladders in construction |
Serious | $3,080 | $2,500 | Dec 27, 2013 | Final |
| Citation 1, item 9 29 CFR 1926.1053(b)(16) · Ladders in construction |
Serious | $3,080 | $2,500 | Dec 27, 2013 | Final |
| Citation 1, item 10a 29 CFR 1926.1060(a)(1)(iii) · Ladder and stairway training |
Serious | $3,080 | $2,000 | Dec 27, 2013 | Final |
| Citation 1, item 10b 29 CFR 1926.1060(a)(1)(v) · Ladder and stairway training |
Serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 2, item 1 29 CFR 1926.95(a) · Criteria for personal protective equipment |
Repeat | $10,780 | $7,000 | Dec 27, 2013 | Final |
| Citation 2, item 2 29 CFR 1926.404(f)(6) · Ground-fault protection on job sites |
Repeat | $7,700 | $5,000 | Dec 27, 2013 | Final |
| Citation 2, item 3 29 CFR 1926.405(b)(1) · Job-site wiring |
Repeat | $7,700 | $3,000 | Dec 27, 2013 | Final |
| Citation 2, item 4 29 CFR 1926.405(g)(2)(iii) · Job-site wiring |
Repeat | $7,700 | $3,000 | Dec 27, 2013 | Final |
| Citation 3, item 1 29 CFR 1926.20(b)(3) · Construction safety programs |
Other-than-serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 3, item 2 29 CFR 1926.50(c) · Medical services and first aid |
Other-than-serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 3, item 3 29 CFR 1926.51(c)(1) · Sanitation |
Other-than-serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 3, item 4 29 CFR 1926.51(f)(1) · Sanitation |
Other-than-serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 3, item 5 29 CFR 1926.150(c)(1)(i) · Fire protection |
Other-than-serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 3, item 6 29 CFR 1926.703(a)(2) · Requirements for cast-in-place concrete |
Other-than-serious | $0 | $0 | Dec 27, 2013 | Final |
| Citation 3, item 7 29 CFR 1926.703(b)(1) · Requirements for cast-in-place concrete |
Other-than-serious | $0 | $0 | Dec 27, 2013 | Final |
New Two Story Residence Pubilko Drive, Village Of As Palacios, Saipan, MP 96950 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.404(f)(6) · Ground-fault protection on job sites |
Serious | $1,020 | $765 | Apr 5, 2013 | Final |
| Citation 1, item 1b 29 CFR 1926.405(b)(1) · Job-site wiring |
Serious | $0 | $0 | Apr 5, 2013 | Final |
| Citation 1, item 1c 29 CFR 1926.405(g)(2)(iii) · Job-site wiring |
Serious | $0 | $0 | Apr 5, 2013 | Final |
| Citation 2, item 1 29 CFR 1926.95(a) · Criteria for personal protective equipment |
Repeat | $80 | $60 | Apr 5, 2013 | Final |
| Citation 3, item 1 29 CFR 1926.405(a)(2)(ii)(e) · Job-site wiring |
Other-than-serious | $0 | $0 | Apr 5, 2013 | Final |
Aqua Resort Power Generator Project, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.95(a) · Criteria for personal protective equipment |
Serious | $1,530 | $1,000 | Dec 10, 2010 | Closed |
Chalan Kanoa Sewer Line Project, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.200(g)(2) · Accident prevention signs and tags |
Serious | $225 | $225 | Mar 26, 2010 | Closed |
Amp Theater, Tinian, MP 96952 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Bayogu Lane, Chalan Lau Lau, Saipan, MP 96950 · Rooming and Boarding Houses, Dormitories, and Workers' Camps · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.142(a)(3) · Temporary labor camps |
Serious | $750 | $750 | Oct 17, 2005 | Closed |
| Citation 1, item 1b 29 CFR 1910.142(b)(10) · Temporary labor camps |
Serious | $0 | $0 | Oct 17, 2005 | Closed |
| Citation 1, item 1c 29 CFR 1910.142(d)(10) · Temporary labor camps |
Serious | $0 | $0 | Oct 17, 2005 | Closed |
| Citation 1, item 1d 29 CFR 1910.142(f)(3) · Temporary labor camps |
Serious | $0 | $0 | Oct 17, 2005 | Closed |
| Citation 1, item 1e 29 CFR 1910.142(h)(1) · Temporary labor camps |
Serious | $0 | $0 | Oct 17, 2005 | Closed |
| Citation 1, item 1f 29 CFR 1910.142(h)(3) · Temporary labor camps |
Serious | $0 | $0 | Oct 17, 2005 | Closed |
| Citation 1, item 2 29 CFR 1910.142(c)(1) · Temporary labor camps |
Serious | $750 | $750 | Oct 17, 2005 | Closed |
| Citation 1, item 3a 29 CFR 1910.304(f)(4) · Grounding and circuit protection |
Serious | $450 | $450 | Oct 17, 2005 | Closed |
| Citation 1, item 3b 29 CFR 1910.305(g)(1)(iii) · Electrical wiring methods |
Serious | $0 | $0 | Oct 17, 2005 | Closed |
| Citation 1, item 3c 29 CFR 1910.305(g)(2)(ii) · Electrical wiring methods |
Serious | $0 | $0 | Oct 17, 2005 | Closed |
| Citation 2, item 1 29 CFR 1910.37(a)(3) · Exit routes |
Other-than-serious | $0 | $0 | Oct 17, 2005 | Closed |
| Citation 2, item 2 29 CFR 1910.142(f)(5) · Temporary labor camps |
Other-than-serious | $0 | $0 | Oct 17, 2005 | Closed |
North Field, Next To Hospital, Tinian, MP 96952 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(b)(1) · Scaffolds, general requirements |
Serious | $600 | $600 | Mar 17, 2005 | Closed |
| Citation 1, item 2 29 CFR 1926.451(g)(1) · Scaffolds, general requirements |
Serious | $600 | $600 | Mar 17, 2005 | Closed |
| Citation 2, item 1a 29 CFR 1926.452(b)(2) · Rules for each type of scaffold |
Serious | $600 | $600 | Mar 17, 2005 | Closed |
| Citation 2, item 1b 29 CFR 1926.452(b)(3) · Rules for each type of scaffold |
Serious | $0 | $0 | Mar 17, 2005 | Closed |
Labor Camp Chalan Lau Lau, Saipan, MP 96950 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Wsr School, Ck, Saipan, MP 96950 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.28(a) · Personal protective equipment |
Serious | $525 | $525 | Sep 28, 1999 | Closed |
| Citation 1, item 2 29 CFR 1926.1051(b) · Stairways and Ladders: general requirements |
Serious | $525 | $525 | Sep 28, 1999 | Closed |
| Citation 2, item 1 29 CFR 1926.1060(a) · Ladder and stairway training |
Other-than-serious | $0 | $0 | Sep 28, 1999 | Closed |
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2017, the Saipan site logged 3 recordable injuries or illnesses among about 22 workers: 18.9 per 100 full-time workers, against a median of 0.6 for its industry.
| Site and year | Workers | Cases | Days-away cases | Rate | Industry median |
|---|---|---|---|---|---|
| usa fanter corporation ltd Saipan · 2017 | 22 | 3 | 0 | 18.9 | 0.6 |
Cases by the Labor Department's Wage and Hour Division since 2015: unpaid minimum wage or overtime, child labor, family leave and more.
| Period reviewed | Violations | Workers owed | Back wages | Penalties |
|---|---|---|---|---|
| Feb 7, 2017 to Mar 14, 2018 Saipan | 19 | 19 | $7,300 | $0 |
| Feb 7, 2015 to Feb 6, 2017 Saipan | 6 | 5 | $5,209 | $935 |
| Mar 21, 2014 to Mar 20, 2016 Saipan | 4 | 2 | $1,820 | $0 |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1904.39(a)(2)
(2) Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, you must report the in-patient hospitalization, amputation, or loss of an eye to OSHA.
29 CFR 1910.142(a)(3)
(3) The grounds and open areas surrounding the shelters shall be maintained in a clean and sanitary condition free from rubbish, debris, waste paper, garbage, or other refuse.
29 CFR 1910.142(b)(10)
(10) In camps where cooking facilities are used in common, stoves (in ratio of one stove to 10 persons or one stove to two families) shall be provided in an enclosed and screened shelter. Sanitary facilities shall be provided for storing and preparing food.
Alert subscribers get notified of each newly cited employer in Northern Mariana Islands the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.