Speonk, New York · Wood Kitchen Cabinet and Countertop Manufacturing · NAICS 337110

1inspections
12citation items
$6,781current penalties
Aug 20, 2024last inspection

OSHA inspectors have visited White Whale Construction Corp in New York one time.

It opened on Aug 20, 2024 after a complaint, in Speonk and is still open.

In all, OSHA issued 12 citation items: 11 serious and 1 other-than-serious.

The proposed penalties came to $8,909; today they stand at $6,781, 24% less.

The rule cited most here is 1910.134 (respiratory protection), 4 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. White Whale Construction Corp averages $6,781 across 1 cited inspection.

White Whale Construction Corp: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

358employers cited

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch White Whale Construction Corp and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347698029 OPENED AUG 20, 2024Open

Complaint · Partial · Health · 4 employees at the site · Open

1448 Speonk Riverhead Road Unit #40, Speonk, NY 11972 · Wood Kitchen Cabinet and Countertop Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$2,837$2,128Feb 12, 2025Final
Citation 1, item 1b
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$0$0Feb 12, 2025Final
Citation 1, item 1c
29 CFR 1910.107(c)(9)(i) · Spray painting and finishing
Serious$0$0Feb 12, 2025Final
Citation 1, item 1d
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$0$0Feb 12, 2025Final
Citation 1, item 2a
29 CFR 1910.134(c) · Respiratory protection
Serious$2,837$2,128Feb 12, 2025Final
Citation 1, item 2b
29 CFR 1910.134(c)(1)(ii) · Respiratory protection
Serious$0$0Feb 12, 2025Final
Citation 1, item 2c
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$0$0Feb 12, 2025Final
Citation 1, item 2d
29 CFR 1910.134(k) · Respiratory protection
Serious$0$0Feb 12, 2025Final
Citation 1, item 3a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$2,837$2,128Feb 12, 2025Final
Citation 1, item 3b
29 CFR 1910.1200(g)(1) · Hazard communication
Serious$0$0Feb 12, 2025Final
Citation 1, item 3c
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Feb 12, 2025Final
Citation 2, item 1
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$398$398Aug 8, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(5)(iv)

(iv) Space within the spray booth on the downstream and upstream sides of filters shall be protected with approved automatic sprinklers.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

Other wood kitchen cabinet and countertop manufacturing employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.