Inspection 345528103 OPENED SEP 7, 2021Closed
195 S Geneva Rd, Lindon, UT 84042 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Whitewater Whirlpool Baths & Systems Inc has 12 OSHA inspections on record in Utah, the first in 1993.
OSHA's last visit started on Sep 7, 2021 on a referral, in Lindon.
Across those inspections OSHA issued 46 citation items: 15 serious and 31 other-than-serious.
OSHA proposed $20,600 in penalties. After settlements and reviews the total is $12,168, down 41%.
Most often, OSHA cited 1910.1200, hazard communication (9 items).
For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Whitewater Whirlpool Baths & Systems Inc averages $4,200 over 1 cited inspection in that time.
Utah · latest 90 days of OSHA records
73employers cited
Get notified the morning OSHA posts each new citation in Utah: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Utah
Checking a subcontractor, a client or your own company? Watch Whitewater Whirlpool Baths & Systems Inc and get notified the morning OSHA posts a new citation for it.
Watch this company195 S Geneva Rd, Lindon, UT 84042 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
195 S Geneva Rd, Lindon, UT 84042 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.134(c)(1) · Respiratory protection |
Serious | $3,500 | $1,750 | Sep 13, 2021 | Final |
| Citation 1, item 2a 29 CFR 1910.1200(f)(6) · Hazard communication |
Serious | $3,500 | $1,750 | Sep 13, 2021 | Final |
| Citation 1, item 2b 29 CFR 1910.1200(g)(8) · Hazard communication |
Serious | $0 | $0 | Sep 13, 2021 | Final |
| Citation 1, item 2c 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Sep 13, 2021 | Final |
| Citation 2, item 1a 29 CFR 1910.178(l)(6) · Forklifts and other powered industrial trucks |
Other-than-serious | $700 | $350 | Sep 13, 2021 | Final |
| Citation 2, item 1b 29 CFR 1910.178(q)(7) · Forklifts and other powered industrial trucks |
Other-than-serious | $0 | $0 | Sep 13, 2021 | Final |
| Citation 2, item 2 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Sep 13, 2021 | Final |
| Citation 2, item 3a 29 CFR 1910.141(a)(3) · Sanitation |
Other-than-serious | $700 | $350 | Sep 13, 2021 | Final |
| Citation 2, item 3b 29 CFR 1910.141(b)(1)(iii) · Sanitation |
Other-than-serious | $0 | $0 | Sep 13, 2021 | Final |
| Citation 2, item 4a 29 CFR 1910.303(b)(1) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Sep 13, 2021 | Final |
| Citation 2, item 4b 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Sep 13, 2021 | Final |
195 South Geneva Road, Lindon, UT 84042 · All Other Miscellaneous Nonmetallic Mineral Product Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 2, item 1 29 CFR 1910.1200(f)(5) · Hazard communication |
Other-than-serious | $600 | $300 | Dec 31, 2012 | Closed |
Approx 2500 W 2500 N, Clinton, UT 84015 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.21(b)(3) · Construction safety training |
Serious | $4,000 | $1,600 | Dec 6, 2006 | Final |
| Citation 2, item 1a 29 CFR 1910.1200(g)(1) · Hazard communication |
Serious | $1,200 | $480 | Dec 6, 2006 | Final |
| Citation 2, item 1b 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Dec 6, 2006 | Final |
330 W 200 S, Pleasant Grove, UT 84062 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
330 W 200 S, Pleasant Grove, UT 84062 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
195 South Geneva Road, Lindon, UT 84042 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.134(d)(1)(iii) · Respiratory protection |
Serious | $1,625 | $812 | May 7, 2004 | Closed |
330 W 200 S, Pleasant Grove, UT 84062 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.134(c)(1) · Respiratory protection |
Serious | $1,050 | $1,050 | Nov 20, 2003 | Closed |
| Citation 1, item 1b 29 CFR 1910.134(d)(3)(iiib)(2) · Respiratory protection |
Serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 1, item 1c 29 CFR 1910.134(e)(1) · Respiratory protection |
Serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 1, item 1d 29 CFR 1910.134(h)(1)(i) · Respiratory protection |
Serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 1, item 2 29 CFR 1910.151(c) · First aid and eyewash |
Serious | $1,050 | $1,050 | Nov 20, 2003 | Closed |
| Citation 1, item 3 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $1,050 | $1,050 | Nov 20, 2003 | Closed |
| Citation 2, item 1 29 CFR 1910.95(c)(1) · Noise |
Other-than-serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 2, item 2 29 CFR 1910.106(e)(6)(ii) · Flammable liquids |
Other-than-serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 2, item 3 29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks |
Other-than-serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 2, item 4 29 CFR 1910.242(b) · Hand and power tools |
Other-than-serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 2, item 5 29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting |
Other-than-serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 2, item 6 29 CFR 1910.303(f) · Electrical equipment, general requirements |
Other-than-serious | $750 | $750 | May 7, 2004 | Closed |
| Citation 2, item 7 29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Nov 20, 2003 | Closed |
| Citation 2, item 8 29 CFR 1910.1200(f)(5) · Hazard communication |
Other-than-serious | $0 | $0 | Nov 20, 2003 | Closed |
195 South Geneva Road, Lindon, UT 84042 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
195 South Geneva Road, Lindon, UT 84042 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $875 | $875 | Feb 3, 1998 | Closed |
| Citation 2, item 1 | Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 2 29 CFR 1910.106(d)(4)(iv) · Flammable liquids |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 3 29 CFR 1910.107(b)(5)(i) · Spray painting and finishing |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 4 29 CFR 1910.107(f)(3) · Spray painting and finishing |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 5 29 CFR 1910.107(g)(2) · Spray painting and finishing |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 6 29 CFR 1910.132(d)(1)(i) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 7 29 CFR 1910.134(b)(10) · Respiratory protection |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 8 29 CFR 1910.134(e)(5)(i) · Respiratory protection |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 9 29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 10 29 CFR 1910.213(h)(1) · Woodworking machinery |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 11 29 CFR 1910.213(h)(4) · Woodworking machinery |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 12 29 CFR 1910.305(b)(2) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 13 29 CFR 1910.305(g)(2)(ii) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 14 29 CFR 1910.1200(f)(5) · Hazard communication |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
| Citation 2, item 15 29 CFR 1910.1200(h)(1) · Hazard communication |
Other-than-serious | $0 | $0 | Feb 3, 1998 | Closed |
195 South Geneva Road, Lindon, UT 84042 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
195 South Geneva Road, Lindon, UT 84042 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.106(d)(4)(iv)
(iv) Ventilation. Every inside storage room shall be provided with either a gravity or a mechanical exhaust ventilation system. Such system shall be designed to provide for a complete change of air within the room at least six times per hour. If a mechanical exhaust system is used, it shall be controlled by a switch located outside of the door. The ventilating equipment and any lighting fixtures shall be operated by the same switch. A pilot light shall be installed adjacent to the switch if Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), are dispensed within the room. Where gravity ventilation is provided, the fresh air intake, as well as the exhaust outlet from the room, shall be on the exterior of the building in which the room is located.
29 CFR 1910.106(e)(6)(ii)
(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.
29 CFR 1910.107(b)(5)(i)
(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.
Alert subscribers get notified of each newly cited employer in Utah the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.