OSHA SearchOSHA records by employer

Zephyr3 LLC: OSHA inspections and violations

Port Saint Lucie, Florida · Wood Kitchen Cabinet and Countertop Manufacturing · NAICS 337110

1inspections
7citation items
$38,089current penalties
Mar 12, 2025last inspection

OSHA has inspected Zephyr3 LLC once in Florida.

The inspection began on Mar 12, 2025 as a planned inspection, in Port Saint Lucie.

That inspection ended with 7 citation items: 7 serious.

Penalties were first proposed at $38,089 and still stand at $38,089.

Spray painting and finishing comes up most often in these citations: 4 items under 1910.107.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Zephyr3 LLC averages $38,089 (1 cited inspection).

Zephyr3 LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites Zephyr3 LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348103193 OPENED MAR 12, 2025Closed

Planned · Partial · Safety · 30 employees at the site · Closed Sep 22, 2026

740 Northwest Enterprise Drive, Port Saint Lucie, FL 34986 · Wood Kitchen Cabinet and Countertop Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(8) · Spray painting and finishing
Serious$5,627$5,627Jun 24, 2025Final
Citation 1, item 1b
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Jun 24, 2025Final
Citation 1, item 1c
29 CFR 1910.107(c)(2) · Spray painting and finishing
Serious$0$0Jun 24, 2025Final
Citation 1, item 2
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$5,979$5,979Jun 24, 2025Final
Citation 1, item 3
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$8,276$8,276Jun 24, 2025Final
Citation 1, item 4
29 CFR 1910.242(b) · Hand and power tools
Serious$8,276$8,276Jun 24, 2025Final
Citation 1, item 5
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$9,931$9,931Jun 24, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(8)

(8) Separation of operations. Each spray booth shall be separated from other operations by not less than 3 feet, or by a greater distance, or by such partition or wall as to reduce the danger from juxtaposition of hazardous operations. See also paragraph (c)(1) of this section.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.107(c)(2)

(2) Minimum separation. There shall be no open flame or spark producing equipment in any spraying area nor within 20 feet thereof, unless separated by a partition.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.242 · Hand and power tools

29 CFR 1910.304 · Grounding and circuit protection

Other wood kitchen cabinet and countertop manufacturing employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.