Berry Plastics Corporation: OSHA inspections and violations
Monroeville, Ohio · All Other Plastics Product Manufacturing · NAICS 326199
5inspections
13citation items
$81,920current penalties
Mar 1, 2017last inspection
OSHA has inspected Berry Plastics Corporation 5 times in Ohio since 2013.
The latest one began on Mar 1, 2017 on a referral, in Monroeville.
Those inspections ended with 13 citation items: 7 serious, 2 repeat and 4 other-than-serious.
Penalties were first proposed at $179,488 and now stand at $81,920, 54% lower after settlements or reviews.
Lockout/tagout comes up most often in these citations: 4 items under 1910.147.
How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,500, and Berry Plastics Corporation averages $16,175 (2 cited inspections).
Berry Plastics Corporation also files yearly injury logs with OSHA, summarized below.
It reported 1 severe injury to OSHA since 2015.
Citation items per year, by inspection date.
Ohio · latest 90 days of OSHA records
263employers cited
6 of them in the same industry
Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch Berry Plastics Corporation and get notified the morning OSHA posts a new citation for it.
OSHA records show Berry Plastics Corporation at 16 sites in 9 states. Together they've had 24 inspections and $180,089 in current penalties.
We match records by employer name and industry, so these sites are likely the same company, not certainly. Franchises and subsidiaries can file under one name.
Included with any plan: the site-by-site record for all 16 sites, with repeat and willful violations and citations per year for the whole company. Already a subscriber? Sign in.
Incident on Mar 21, 2017: Employee sustains partial amputation of fingers in jammed pr
At 1:00 p.m. on March 21, 2017, Employee #1 was operating a LC10 press. There was a jammed lid in the press and the employee reached through the guard to remove it. Employee #1 sustained a partial amputation of the index and middle fingers on his left hand.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2020, the Aurora site logged 4 recordable injuries or illnesses among about 111 workers: 3.4 per 100 full-time workers, against a median of 2.6 for its industry. Those cases cost 71 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Berry Plastics Corporation
Aurora · 2020
111
4
2
3.4
2.6
Included with any plan: 4 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.
Feb 21, 2017, Monroeville: Amputation · amputations · fingertip(s)
An employee was attempting to unjam a stacker machine when the employee's left hand was caught in the machine, amputating the index and middle fingertips.
The rules behind these citations
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.
29 CFR 1910.147(c)(6)(i)
(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.
29 CFR 1910.147(c)(7)(i)(b)
(B) Each affected employee shall be instructed in the purpose and use of the energy control procedure.
Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.