Inspection 347230500 OPENED JAN 23, 2024Closed
4355 Dorchester Rd, North Charleston, SC 29405 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
North Charleston, South Carolina · Fabricated Structural Metal Manufacturing · NAICS 332312
OSHA has inspected Leatherwood Manufacturing Inc 6 times in South Carolina since 2013.
The latest one began on Jan 23, 2024 to follow up on an earlier case, in North Charleston.
Those inspections ended with 40 citation items: 26 serious and 14 other-than-serious.
Penalties were first proposed at $37,325 and now stand at $16,378, 56% lower after settlements or reviews.
Respiratory protection comes up most often in these citations: 7 items under 1910.134.
How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Leatherwood Manufacturing Inc averages $7,664 (2 cited inspections).
South Carolina · latest 90 days of OSHA records
41employers cited
Get notified the morning OSHA posts each new citation in South Carolina: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in South Carolina
Checking a subcontractor, a client or your own company? Watch Leatherwood Manufacturing Inc and get notified the morning OSHA posts a new citation for it.
Watch this company4355 Dorchester Rd, North Charleston, SC 29405 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
4355 Dorchester Rd, North Charleston, SC 29405 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
4355 Dorchester Rd, North Charleston, SC 29405 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
4355 Dorchester Rd, North Charleston, SC 29405 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 3 29 CFR 1910.134(g)(1)(i) · Respiratory protection |
Other-than-serious | $0 | $0 | Jan 8, 2021 | Final |
| Citation 1, item 4 29 CFR 1910.134(m)(1) · Respiratory protection |
Other-than-serious | $0 | $0 | Jan 8, 2021 | Final |
| Citation 1, item 5 29 CFR 1910.134(m)(2)(ii) · Respiratory protection |
Other-than-serious | $0 | $0 | Jan 8, 2021 | Final |
| Citation 1, item 6a 29 CFR 1910.134(c)(1) · Respiratory protection |
Other-than-serious | $450 | $450 | Jan 8, 2021 | Final |
| Citation 1, item 6b 29 CFR 1910.134(f)(2) · Respiratory protection |
Other-than-serious | $450 | $0 | Jan 8, 2021 | Final |
4355 Dorchester Rd, North Charleston, SC 29405 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 7 29 CFR 1910.133(a)(3) · Eye and face protection |
Serious | $1,000 | $780 | Aug 31, 2020 | Final |
| Citation 1, item 8 29 CFR 1910.147(c)(1) · Lockout/tagout |
Serious | $4,200 | $3,276 | Aug 31, 2020 | Final |
| Citation 1, item 9 29 CFR 1910.184(i)(9) · Slings |
Serious | $875 | $682 | Aug 31, 2020 | Final |
| Citation 1, item 18 29 CFR 1910.215(b)(9) · Grinders and abrasive wheels |
Serious | $1,250 | $975 | Aug 31, 2020 | Final |
| Citation 1, item 19 29 CFR 1910.242(b) · Hand and power tools |
Serious | $2,500 | $1,950 | Aug 31, 2020 | Final |
| Citation 1, item 20 29 CFR 1910.252(b)(2)(iii) · Welding fire safety |
Serious | $1,250 | $975 | Aug 31, 2020 | Final |
| Citation 1, item 24a 29 CFR 1910.36(c)(1) · Exit route design |
Serious | $2,500 | $2,500 | Aug 31, 2020 | Final |
| Citation 1, item 24b 29 CFR 1910.36(d)(1) · Exit route design |
Serious | $2,500 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 25a 29 CFR 1910.107(b)(5)(i) · Spray painting and finishing |
Serious | $1,250 | $975 | Aug 31, 2020 | Final |
| Citation 1, item 25b 29 CFR 1910.107(e)(3) · Spray painting and finishing |
Serious | $1,000 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 25c 29 CFR 1910.107(f)(3) · Spray painting and finishing |
Serious | $1,000 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 25d 29 CFR 1910.107(g)(2) · Spray painting and finishing |
Serious | $1,250 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 26a 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $1,250 | $975 | Aug 31, 2020 | Final |
| Citation 1, item 26b 29 CFR 1910.212(a)(3)(ii) · Machine guarding |
Serious | $1,250 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 26c 29 CFR 1910.212(a)(5) · Machine guarding |
Serious | $1,250 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 27a 29 CFR 1910.213(a)(12) · Woodworking machinery |
Serious | $1,250 | $975 | Aug 31, 2020 | Final |
| Citation 1, item 27b 29 CFR 1910.213(c)(1) · Woodworking machinery |
Serious | $1,250 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 27c 29 CFR 1910.213(c)(2) · Woodworking machinery |
Serious | $1,250 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 27d 29 CFR 1910.213(c)(3) · Woodworking machinery |
Serious | $1,000 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 27e 29 CFR 1910.213(i)(1) · Woodworking machinery |
Serious | $1,250 | $0 | Aug 31, 2020 | Final |
| Citation 1, item 28a 29 CFR 1910.304(g)(5) · Grounding and circuit protection |
Serious | $1,000 | $425 | Aug 31, 2020 | Final |
| Citation 1, item 28b 29 CFR 1910.334(a)(3)(ii) · Using electrical equipment |
Serious | $2,500 | $0 | Aug 31, 2020 | Final |
| Citation 2, item 1 29 CFR 1910.28(b)(11) · Fall protection in general industry |
Other-than-serious | $0 | $0 | Aug 31, 2020 | Final |
| Citation 2, item 2 29 CFR 1910.37(b)(6) · Exit routes |
Other-than-serious | $0 | $0 | Aug 31, 2020 | Final |
| Citation 2, item 3 29 CFR 1910.303(b)(7)(iv) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Aug 31, 2020 | Final |
| Citation 2, item 4 29 CFR 1910.303(f)(2) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Aug 31, 2020 | Final |
| Citation 2, item 5 29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Aug 31, 2020 | Final |
| Citation 2, item 6 29 CFR 1910.305(g)(1)(iv) · Electrical wiring methods |
Other-than-serious | $500 | $390 | Aug 31, 2020 | Final |
4355 Dorchester Rd, North Charleston, SC 29405 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.134(e)(1) · Respiratory protection |
Serious | $525 | $262 | Jan 21, 2014 | Closed |
| Citation 1, item 2 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $525 | $262 | Jan 21, 2014 | Closed |
| Citation 1, item 3 29 CFR 1910.215(b)(9) · Grinders and abrasive wheels |
Serious | $525 | $262 | Jan 21, 2014 | Closed |
| Citation 1, item 4 29 CFR 1910.304(g)(6)(vi)(c)(5) · Grounding and circuit protection |
Serious | $525 | $262 | Jan 21, 2014 | Closed |
| Citation 2, item 1 29 CFR 1910.134(k)(1) · Respiratory protection |
Other-than-serious | $0 | $0 | Jan 21, 2014 | Closed |
| Citation 2, item 2 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Other-than-serious | $0 | $0 | Jan 21, 2014 | Closed |
| Citation 2, item 3 29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks |
Other-than-serious | $0 | $0 | Jan 21, 2014 | Closed |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.107(b)(5)(i)
(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.
29 CFR 1910.107(e)(3)
(3) Containers. Original closed containers, approved portable tanks, approved safety cans or a properly arranged system of piping shall be used for bringing flammable liquids or liquids with a flashpoint greater than 199.4 °F (93 °C) into spray finishing room. Open or glass containers shall not be used.
29 CFR 1910.107(f)(3)
(3) Cleaning of heads. Sprinklers protecting spraying areas shall be kept as free from deposits as practical by cleaning daily if necessary. (See also paragraph (g) of this section.)
Alert subscribers get notified of each newly cited employer in South Carolina the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.