OSHA SearchOSHA records by employer

Spector Manufacturing Incorporated: OSHA inspections and violations

Saint Clair, Pennsylvania · Truck Trailer Manufacturing · NAICS 336212

4inspections
20citation items
$7,725current penalties
Nov 12, 2015last inspection

Spector Manufacturing Incorporated has 4 OSHA inspections on record in Pennsylvania, the first in 1997.

OSHA's last visit started on Nov 12, 2015 after a complaint, in Saint Clair.

Across those inspections OSHA issued 20 citation items: 14 serious and 6 other-than-serious.

OSHA proposed $13,105 in penalties. After settlements and reviews the total is $7,725, down 41%.

Most often, OSHA cited 1910.134, respiratory protection (3 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Spector Manufacturing Incorporated averages $4,800 over 1 cited inspection in that time.

Spector Manufacturing Incorporated: OSHA citation items per year, 1997 to 2015
Citation items per year, by inspection date.

Pennsylvania · latest 90 days of OSHA records

285employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Pennsylvania: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Pennsylvania

Checking a subcontractor, a client or your own company? Watch Spector Manufacturing Incorporated and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341053171 OPENED NOV 12, 2015Closed

Complaint · Partial · Safety · 39 employees at the site · Closed Jun 21, 2016

Po Box 158 Industrial Park Road, Saint Clair, PA 17970 · Truck Trailer Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$3,500$2,400May 9, 2016Final
Citation 1, item 2a
29 CFR 1910.36(d)(1) · Exit route design
Serious$2,380$0May 9, 2016Final
Citation 1, item 2b
29 CFR 1910.37(a)(4) · Exit routes
Serious$0$0May 9, 2016Final
Citation 1, item 3
29 CFR 1910.212(a)(1) · Machine guarding
Serious$3,500$2,400May 9, 2016Final
Citation 2, item 1
29 CFR 1910.29(a)(2)(i) · Manually propelled mobile ladder stands and scaffolds (towers)
Other-than-serious$0$0May 9, 2016Final

Inspection 314157413 OPENED JUL 13, 2010Closed

Planned · Partial · Health · 23 employees at the site · Closed Nov 22, 2010

Industrial Park Road, Saint Clair, PA 17970 · Truck Trailer Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$600$420Sep 22, 2010Closed
Citation 1, item 1b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Sep 22, 2010Closed
Citation 1, item 1c
29 CFR 1910.134(f)(1) · Respiratory protection
Serious$0$0Sep 22, 2010Closed
Citation 1, item 2a
29 CFR 1910.146(c)(5)(ib) · Permit-required confined spaces
Serious$600$420Sep 22, 2010Closed
Citation 1, item 2b
29 CFR 1910.146(g)(1) · Permit-required confined spaces
Serious$0$0Sep 22, 2010Closed
Citation 1, item 3a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$600$420Sep 22, 2010Closed
Citation 1, item 3b
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Sep 22, 2010Closed
Citation 2, item 1 Other-than-serious$0$0Sep 22, 2010Closed

Inspection 303346555 OPENED OCT 19, 2001Closed

Complaint · Partial · Safety · 31 employees at the site · Closed Feb 19, 2002

Industrial Park Road, Saint Clair, PA 17970 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$875$875Nov 2, 2001Closed
Citation 1, item 2
29 CFR 1910.243(c)(1) · Guarding of portable powered tools
Serious$525$525Nov 2, 2001Closed

Inspection 17617606 OPENED MAR 17, 1997Closed

Planned · Complete · Health · 46 employees at the site · Closed Jun 12, 1997

Industrial Park Road, Saint Clair, PA 17970 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$525$265Apr 3, 1997Closed
Citation 2, item 1
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Other-than-serious$0$0Apr 3, 1997Closed
Citation 2, item 2
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Other-than-serious$0$0Apr 3, 1997Closed
Citation 2, item 3
29 CFR 1910.1001(j)(2)(iii) · Asbestos in general industry
Other-than-serious$0$0Apr 3, 1997Closed
Citation 2, item 4
29 CFR 1910.1025(d)(2) · Lead in general industry
Other-than-serious$0$0Apr 3, 1997Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1001 · Asbestos in general industry

29 CFR 1910.1001(j)(2)(iii)

(2) Installed Asbestos Containing Material. Employers and building owners are required to treat installed TSI and sprayed on and troweled-on surfacing materials as ACM in buildings constructed no later than 1980 for purposes of this standard. These materials are designated “presumed ACM or PACM”, and are defined in paragraph (b) of this section. Asphalt and vinyl flooring material installed no later than 1980 also must be treated as asbestos-containing. The employer or building owner may demonstrate that PACM and flooring material do not contain asbestos by complying with paragraph (j)(8)(iii) of this section.

29 CFR 1910.1025 · Lead in general industry

29 CFR 1910.1025(d)(2)

(2) Initial determination. Each employer who has a workplace or work operation covered by this standard shall determine if any exployee may be exposed to lead at or above the action level.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.212 · Machine guarding

29 CFR 1910.243 · Guarding of portable powered tools

29 CFR 1910.29 · Manually propelled mobile ladder stands and scaffolds (towers)

29 CFR 1910.36 · Exit route design

29 CFR 1910.37 · Exit routes

29 CFR 1910.95 · Noise

OSH Act Section 5 · General Duty Clause

Other truck trailer manufacturing employers in Pennsylvania

Alert subscribers get notified of each newly cited employer in Pennsylvania the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.