OSHA SearchOSHA records by employer

Kumi Manufacturing Alabama, LLC: OSHA inspections and violations

Clanton, Alabama · All Other Plastics Product Manufacturing · NAICS 326199

9inspections
43citation items
$108,640current penalties
Nov 30, 2021last inspection

OSHA has inspected Kumi Manufacturing Alabama, LLC 9 times in Alabama since 2003.

The latest one began on Nov 30, 2021 after a complaint, in Clanton.

Those inspections ended with 43 citation items: 35 serious, 3 repeat and 5 other-than-serious.

Penalties were first proposed at $156,460 and now stand at $108,640, 31% lower after settlements or reviews.

Formaldehyde comes up most often in these citations: 11 items under 1910.1048.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,500, and Kumi Manufacturing Alabama, LLC averages $26,700 (2 cited inspections).

Kumi Manufacturing Alabama, LLC also files yearly injury logs with OSHA, summarized below.

Kumi Manufacturing Alabama, LLC: OSHA citation items per year, 2003 to 2021
Citation items per year, by inspection date.

Alabama · latest 90 days of OSHA records

97employers cited

Get notified the morning OSHA posts each new citation in Alabama: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Alabama

Checking a subcontractor, a client or your own company? Watch Kumi Manufacturing Alabama, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345660575 OPENED NOV 30, 2021Closed

Complaint · Partial · Safety · 202 employees at the site · Closed Mar 8, 2022

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 344571492 OPENED JAN 15, 2020Closed

Planned · Partial · Health · 260 employees at the site · Closed Jun 18, 2020

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$4,916$3,400May 11, 2020Final
Citation 2, item 1
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Other-than-serious$0$0May 11, 2020Final

Inspection 342075512 OPENED FEB 1, 2017Closed

Planned · Partial · Safety · 850 employees at the site · Closed Jun 21, 2017

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$9,054$9,054Apr 27, 2017Final
Citation 1, item 2a
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$9,054$9,054Apr 27, 2017Final
Citation 1, item 2b
29 CFR 1910.147(c)(6)(i)(c) · Lockout/tagout
Serious$0$0Apr 27, 2017Final
Citation 1, item 3 Serious$9,054$9,054Apr 27, 2017Final
Citation 1, item 4
29 CFR 1910.212(a)(1) · Machine guarding
Serious$7,243$7,243Apr 27, 2017Final
Citation 1, item 5a
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Serious$9,054$9,054Apr 27, 2017Final
Citation 1, item 5b
29 CFR 1910.253(b)(2)(ii) · Gas welding and cutting
Serious$0$0Apr 27, 2017Final
Citation 2, item 1
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$36,215$6,541Apr 27, 2017Final
Citation 3, item 1
29 CFR 1910.29(f)(4) · Fall protection systems in general industry
Other-than-serious$0$0Apr 27, 2017Final

Inspection 339468001 OPENED NOV 5, 2013Closed

Planned · Complete · Health · 254 employees at the site · Closed Nov 14, 2013

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 334704186 OPENED JUN 11, 2012Closed

Planned · Partial · Safety · 150 employees at the site · Closed Sep 5, 2012

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$2,295$2,295Jun 21, 2012Final

Inspection 311238711 OPENED SEP 6, 2007Closed

Complaint · Partial · Health · 200 employees at the site · Closed Apr 2, 2008

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.1048(k) · Formaldehyde
Repeat$7,500$6,000Jan 25, 2008Closed
Citation 1, item 2a Repeat$7,500$6,000Jan 25, 2008Closed
Citation 1, item 2b Repeat$0$0Jan 25, 2008Closed
Citation 2, item 1
29 CFR 1904.29(b)(1) · Injury and illness log
Other-than-serious$1,000$0Jan 25, 2008Closed

Inspection 309349298 OPENED DEC 14, 2005Closed

Unprogrammed related · Complete · Safety · 218 employees at the site · Closed Aug 15, 2006

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(e)(1) · Guarding floor and wall openings and holes
Serious$2,000$1,600May 12, 2006Closed
Citation 1, item 2
29 CFR 1910.23(d)(1)(iii) · Guarding floor and wall openings and holes
Serious$1,600$1,200May 12, 2006Closed
Citation 1, item 3
29 CFR 1910.132(f)(1)(iii) · Personal protective equipment, general requirements
Serious$2,000$1,600May 12, 2006Closed
Citation 1, item 4
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$4,000$4,000May 12, 2006Closed
Citation 1, item 5
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$4,000$4,000May 12, 2006Closed
Citation 1, item 6
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Serious$4,000$2,000May 12, 2006Closed
Citation 1, item 10a
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$2,000$2,000May 12, 2006Closed
Citation 1, item 10b
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$0$0May 12, 2006Closed
Citation 1, item 11a
29 CFR 1910.305(b)(1) · Electrical wiring methods
Serious$2,000$2,000May 12, 2006Closed
Citation 1, item 11b
29 CFR 1910.305(b)(2) · Electrical wiring methods
Serious$0$0May 12, 2006Closed
Citation 1, item 11d
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$0$0May 12, 2006Closed
Citation 1, item 12a
29 CFR 1910.176(a) · Material storage and aisles
Serious$0$2,000May 12, 2006Closed
Citation 1, item 12b
29 CFR 1910.178(n)(4) · Forklifts and other powered industrial trucks
Serious$0$0May 12, 2006Closed
Citation 2, item 1
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Other-than-serious$2,000$0May 12, 2006Closed

Inspection 309414944 OPENED DEC 14, 2005Closed

Accident · Complete · Health · 218 employees at the site · Closed Aug 15, 2006

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Dec 13, 2005: Three employees receives injuries from toxic gas exposure

On December 13, 2005, Employee #1, #2, and #3 were operating extruding and formi ng machinery in a molding process. During the operation, a thermoplastic resin i s injected into the mold. The mold is then heated to shape the thermoplastic res in into such things as interior trim for automobiles. When the thermoplastic res in is heated, it releases formaldehyde. At the process startup, the operating te mperature was incorrectly programmed to 280 degrees C, which is higher than the maximum temperature of 199 degrees C for the operation. The process overheated, causing the release of formaldehyde gas. Several employees were exposed to the f ormaldehyde gas with three requiring hospitalization. The three employees receiv ed medical attention for systemic toxic poisoning.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.1048(c)(2) · Formaldehyde
Serious$5,600$4,760Jun 7, 2006Closed
Citation 1, item 1b
29 CFR 1910.1048(f)(1) · Formaldehyde
Serious$0$0Jun 7, 2006Closed
Citation 1, item 2
29 CFR 1910.1048(d)(2) · Formaldehyde
Serious$2,000$1,700Jun 7, 2006Closed
Citation 1, item 3a
29 CFR 1910.1048(k) · Formaldehyde
Serious$5,600$4,760Jun 7, 2006Closed
Citation 1, item 3b Serious$0$0Jun 7, 2006Closed
Citation 1, item 4a Serious$2,000$1,200Jun 7, 2006Closed
Citation 1, item 4b Serious$0$0Jun 7, 2006Closed
Citation 1, item 5
29 CFR 1910.1048(n)(1) · Formaldehyde
Serious$5,600$3,500Jun 7, 2006Closed
Citation 2, item 1
29 CFR 1904.32(b)(3) · Yearly injury summary
Serious$800$0Jun 7, 2006Closed
1 older inspection

Inspection 306905803 OPENED NOV 10, 2003Closed

Planned · Partial · Safety · 172 employees at the site · Closed Mar 1, 2004

2543 7th Street South, Clanton, AL 35046 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$1,375$1,375Jan 20, 2004Closed
Citation 1, item 2
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$3,500$1,325Jan 20, 2004Closed
Citation 1, item 3
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$3,500$1,925Jan 20, 2004Closed
Citation 2, item 1
29 CFR 1910.1030(f)(2)(iv) · Bloodborne pathogens
Other-than-serious$0$0Jan 20, 2004Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Clanton site logged 4 recordable injuries or illnesses among about 346 workers: 1.0 per 100 full-time workers, against a median of 2.6 for its industry. Those cases cost 24 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Kumi Manufacturing Alabama
Clanton · 2025
346 431.02.6
Kumi Manufacturing Alabama LLC
Clanton · 2024
285 712.12.6

Included with any plan: 8 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.29 · Injury and illness log

29 CFR 1904.29(b)(1)

(b) Implementation—(1) What do I need to do to complete the OSHA 300 Log? You must enter information about your business at the top of the OSHA 300 Log, enter a one or two line description for each recordable injury or illness, and summarize this information on the OSHA 300-A at the end of the year.

29 CFR 1904.32 · Yearly injury summary

29 CFR 1904.32(b)(3)

(3) How do I certify the annual summary? A company executive must certify that he or she has examined the OSHA 300 Log and that he or she reasonably believes, based on his or her knowledge of the process by which the information was recorded, that the annual summary is correct and complete.

29 CFR 1910.1030 · Bloodborne pathogens

29 CFR 1910.1030(f)(2)(iv)

(iv) The employer shall assure that employees who decline to accept hepatitis B vaccination offered by the employer sign the statement in appendix A.

29 CFR 1910.1048 · Formaldehyde

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.176 · Material storage and aisles

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.29 · Fall protection systems in general industry

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

OSH Act Section 5 · General Duty Clause

Other all other plastics product manufacturing employers in Alabama

Alert subscribers get notified of each newly cited employer in Alabama the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.