Inspection 346733264 OPENED MAY 25, 2023Closed
10 Monteith Drive, Farmington, CT 06032 · Other Foundation, Structure, and Building Exterior Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
South Windsor, Connecticut · Structural Steel and Precast Concrete Contractors · NAICS 238120
United Steel, Inc. has 27 OSHA inspections on record in Connecticut, the first in 1997.
OSHA's last visit started on May 25, 2023 on a referral, in Farmington.
Across those inspections OSHA issued 65 citation items: 26 serious and 39 other-than-serious.
OSHA proposed $104,377 in penalties. After settlements and reviews the total is $51,285, down 51%.
Most often, OSHA cited 1910.305, electrical wiring methods (4 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. United Steel, Inc. averages $6,862 over 2 cited inspections in that time.
United Steel, Inc. also files yearly injury logs with OSHA, summarized below.
It reported 7 severe injuries to OSHA since 2015.
Connecticut · latest 90 days of OSHA records
89employers cited
Get notified the morning OSHA posts each new citation in Connecticut: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Connecticut
Checking a subcontractor, a client or your own company? Watch United Steel, Inc. and get notified the morning OSHA posts a new citation for it.
Watch this company10 Monteith Drive, Farmington, CT 06032 · Other Foundation, Structure, and Building Exterior Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
164 School Street, East Hartford, CT 06108 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
245 Eastern Point, Groton, CT 06340 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.754(b)(3) · Structural steel assembly |
Other-than-serious | $14,357 | $8,000 | Oct 5, 2022 | Final |
164 School Street, East Hartford, CT 06108 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.212(a)(3)(ii) · Machine guarding |
Serious | $6,361 | $3,180 | Sep 25, 2018 | Final |
| Citation 1, item 2a 29 CFR 1910.332(b)(1) · Training |
Serious | $5,089 | $2,544 | Sep 25, 2018 | Final |
| Citation 1, item 2b 29 CFR 1910.335(a)(1)(i) · Safeguards for personnel protection |
Serious | $0 | $0 | Sep 25, 2018 | Final |
1011 Washington Blvd, Stamford, CT 06901 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
1 Memorial Drive, West Hartford, CT 06117 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
1125 Farmington Avenue, Farmington, CT 06032 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
472 Main Street, Ridgefield, CT 06877 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.351(b)(2) · Arc welding and cutting |
Serious | $4,500 | $3,000 | Oct 18, 2013 | Final |
995 Hopmeadow Street, Simsbury, CT 06070 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1b 29 CFR 1926.416(a)(3) · Electrical safety in construction |
Serious | $0 | $750 | Jul 25, 2008 | Final |
| Citation 1, item 2 29 CFR 1926.760(a)(1) · Fall protection |
Serious | $1,500 | $900 | Jul 25, 2008 | Final |
| Citation 1, item 3 29 CFR 1926.760(d)(1) · Fall protection |
Serious | $3,000 | $900 | Jul 25, 2008 | Final |
875 Broad Street, Bridgeport, CT 06604 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.760(d)(1) · Fall protection |
Other-than-serious | $1,050 | $0 | Jan 24, 2008 | Closed |
695 Prospect Avenue, West Hartford, CT 06107 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.150(a)(4) · Fire protection |
Other-than-serious | $1,200 | $300 | Mar 30, 2005 | Closed |
87a Putnam Road, Central Village, CT 06332 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
586 Danbury Road, New Milford, CT 06776 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Rockville Hospital 31 Union Street, Rockville, CT 06066 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
196 Bloomfield Avenue, Hartford, CT 06117 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
55 Corneau Way, South Windsor, CT 06074 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 OSH Act Section 5(a)(1) · General Duty Clause |
Other-than-serious | $2,000 | $1,000 | Jun 6, 2001 | Closed |
| Citation 1, item 2a 29 CFR 1910.178(c)(2)(vii) · Forklifts and other powered industrial trucks |
Other-than-serious | $1,600 | $800 | Jun 6, 2001 | Closed |
| Citation 1, item 2b 29 CFR 1910.178(q)(1) · Forklifts and other powered industrial trucks |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 3 29 CFR 1910.212(a)(3)(ii) · Machine guarding |
Serious | $2,000 | $1,000 | Jun 6, 2001 | Closed |
| Citation 1, item 4a 29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements |
Serious | $1,020 | $560 | Jun 6, 2001 | Closed |
| Citation 1, item 4b 29 CFR 1910.305(b)(2) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 5 29 CFR 1910.304(f)(5)(v) · Grounding and circuit protection |
Other-than-serious | $1,020 | $560 | Jun 6, 2001 | Closed |
| Citation 1, item 6a 29 CFR 1910.305(g)(1)(i) · Electrical wiring methods |
Other-than-serious | $1,020 | $560 | Jun 6, 2001 | Closed |
| Citation 1, item 6b 29 CFR 1910.305(g)(1)(iii) · Electrical wiring methods |
Serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 6c 29 CFR 1910.305(g)(2)(ii) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 1 29 CFR 1910.242(b) · Hand and power tools |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 2 29 CFR 1910.244(a)(1)(ii) · Other portable tools and equipment |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 3 29 CFR 1926.405(a)(2)(i) · Job-site wiring |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
164 School Street, East Hartford, CT 06108 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.106(d)(4)(i) · Flammable liquids |
Serious | $1,600 | $800 | Jun 6, 2001 | Closed |
| Citation 1, item 1b 29 CFR 1910.106(d)(4)(v) · Flammable liquids |
Serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 1c 29 CFR 1910.106(d)(4)(iv) · Flammable liquids |
Serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 2a 29 CFR 1910.107(c)(5) · Spray painting and finishing |
Serious | $1,600 | $800 | Jun 6, 2001 | Closed |
| Citation 1, item 2b 29 CFR 1910.107(e)(9) · Spray painting and finishing |
Serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 2c 29 CFR 1910.107(g)(2) · Spray painting and finishing |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 2d 29 CFR 1910.107(g)(3) · Spray painting and finishing |
Serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 3 29 CFR 1910.134(e)(1) · Respiratory protection |
Other-than-serious | $1,200 | $600 | Jun 6, 2001 | Closed |
| Citation 1, item 4a 29 CFR 1910.134(h)(1) · Respiratory protection |
Other-than-serious | $1,200 | $600 | Jun 6, 2001 | Closed |
| Citation 1, item 4b 29 CFR 1910.134(h)(2)(i) · Respiratory protection |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 1, item 5a 29 CFR 1910.252(b)(2)(ia) · Welding fire safety |
Serious | $1,360 | $680 | Jun 6, 2001 | Closed |
| Citation 1, item 5b 29 CFR 1910.252(b)(2)(iii) · Welding fire safety |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 1 29 CFR 1904.2(a) · Partial exemption for establishments in certain industries |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 2 29 CFR 1910.95(d)(3) · Noise |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 3 29 CFR 1910.95(l)(1) · Noise |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 4 29 CFR 1910.95(m)(2)(iie) · Noise |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 5 29 CFR 1910.134(d)(3)(iiib)(2) · Respiratory protection |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 7 29 CFR 1910.1200(f)(5)(i) · Hazard communication |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
| Citation 2, item 8 29 CFR 1910.1200(f)(5)(ii) · Hazard communication |
Other-than-serious | $0 | $0 | Jun 6, 2001 | Closed |
196 Bloomfield Avenue, Hartford, CT 06117 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.1052(c)(4) · Stairways in construction |
Other-than-serious | $1,500 | $0 | Jun 20, 2001 | Closed |
| Citation 2, item 1 29 CFR 1926.451(g)(1) · Scaffolds, general requirements |
Serious | $6,000 | $6,000 | Jun 20, 2001 | Closed |
Bio-physics Building, University Of Connecticut, Storrs, CT 06268 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1d 29 CFR 1926.752(d)(2) · Site layout, site-specific erection plan and construction sequence |
Other-than-serious | $0 | $0 | Sep 9, 1999 | Closed |
1525 Boston Post Road, Milford, CT 06460 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.351(b)(3) · Arc welding and cutting |
Other-than-serious | $2,000 | $200 | Mar 24, 1999 | Closed |
| Citation 1, item 2 29 CFR 1926.501(b)(12) · Fall protection in construction |
Serious | $4,000 | $400 | Mar 24, 1999 | Closed |
| Citation 2, item 1 29 CFR 1926.105(a) · Safety nets |
Serious | $8,000 | $800 | Mar 24, 1999 | Closed |
4 Research Drive, Shelton, CT 06484 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.105(a) · Safety nets |
Serious | $3,000 | $2,500 | Oct 28, 1998 | Final |
10 Riverview Drive, Danbury, CT 06810 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(f)(7) · Scaffolds, general requirements |
Other-than-serious | $4,000 | $2,000 | Feb 19, 1999 | Closed |
| Citation 1, item 2 29 CFR 1926.451(h)(1) · Scaffolds, general requirements |
Other-than-serious | $5,600 | $2,800 | Feb 19, 1999 | Closed |
| Citation 1, item 3 29 CFR 1926.452(w)(7) · Rules for each type of scaffold |
Other-than-serious | $4,000 | $2,000 | Feb 19, 1999 | Closed |
| Citation 1, item 4a 29 CFR 1926.454(a) · Scaffold training |
Serious | $4,000 | $2,000 | Feb 19, 1999 | Closed |
| Citation 1, item 4b 29 CFR 1926.454(b) · Scaffold training |
Serious | $0 | $0 | Feb 19, 1999 | Closed |
100 Arnold Way, Timothy Edwards Middle School, South Windsor, CT 06074 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.251(c)(4)(ii) · Rigging equipment for material handling |
Other-than-serious | $2,275 | $1,138 | Jun 1, 1998 | Closed |
| Citation 1, item 1b 29 CFR 1926.251(c)(4)(iv) · Rigging equipment for material handling |
Other-than-serious | $0 | $0 | Jun 1, 1998 | Closed |
| Citation 1, item 1c 29 CFR 1926.251(c)(5) · Rigging equipment for material handling |
Other-than-serious | $0 | $0 | Jun 1, 1998 | Closed |
| Citation 1, item 2a 29 CFR 1926.502(b)(4) · Fall protection systems |
Other-than-serious | $1,300 | $650 | Jun 1, 1998 | Closed |
| Citation 1, item 2b 29 CFR 1926.502(b)(6) · Fall protection systems |
Other-than-serious | $0 | $0 | Jun 1, 1998 | Closed |
| Citation 1, item 3 29 CFR 1926.752(d)(2) · Site layout, site-specific erection plan and construction sequence |
Other-than-serious | $975 | $488 | Jun 1, 1998 | Closed |
| Citation 1, item 4 29 CFR 1926.1053(b)(9) · Ladders in construction |
Serious | $1,300 | $650 | Jun 1, 1998 | Closed |
| Citation 2, item 1 29 CFR 1926.20(b)(3) · Construction safety programs |
Other-than-serious | $0 | $0 | Jun 1, 1998 | Closed |
| Citation 2, item 2 29 CFR 1926.150(a)(4) · Fire protection |
Other-than-serious | $0 | $0 | Jun 1, 1998 | Closed |
100 Arnold Way, Timothy Edwards Middle School, South Windsor, CT 06074 · OSHA's record · Phone and website on Google Maps
Incident on Feb 23, 1998: Employee injured in fall from steel beam
Employee #1 had just finished bolting several pieces of I-beam on the second lev el of a building. He was heading to another section of the building by walking o n the bottom flange of an I-beam when his right foot slipped off and he fell app roximately 20 ft 10 in. He sustained injuries that required hospitalization. Rai n had fallen that morning and the bottom flange of the beam was wet. It was not raining at the time of the accident.
No citations from this inspection.
Backus Memorial Hospital, 326 Washington Street, Norwich, CT 06360 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
775 Main Street South, Southbury, CT 06488 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.105(a) · Safety nets |
Serious | $1,250 | $625 | Apr 9, 1997 | Closed |
775 Main Street South, Southbury, CT 06488 · OSHA's record · Phone and website on Google Maps
Incident on Jan 13, 1997: Two employees injured when motorist strikes work truck
At approximately 2:30 p.m. on December 2, 1996, Employees #1 and #2, of Burns Co nstruction, were using an asphalt cutting saw to make an approximately 3 ft wide opening in the road. The saw was 6 ft 7 in. from the curb on the northeast boun d lane. Their work truck, a 1972 GMC flatbed vehicle, license #CT G14346, was pa rked at the corner of two streets, and the passenger front wheel was on the lawn opposite utility pole #996. A woman driving a 1987 four door white Ford sedan, #CT 233KRO, was apparently blinded by the sun as she came upon the construction area. While obtaining her sunglasses from the rearview mirror, she drove into th e parked work truck. At the time of the crash, Employee #1 was apparently walkin g alongside the driver's side between the rear tires and the driver's side door to retrieve the street cones., and Employee #2 was setting up the saw to make an other cut in the asphalt. Both workers sustained injuries that required hospital ization. At approximately 4:15 p.m., the Bridgeport area office received an anon ymous call stating that a car had injured one or more employees of Burns Constru ction who had been engaged in road work. Subsequent investigation found six cone s on the site and no warning signs. Both employees were wearing reflective vests .
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.751(c)(2) · Steel Erection: definitions |
Serious | $2,500 | $1,500 | Feb 11, 1997 | Closed |
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2025, the East Hartford site logged 13 recordable injuries or illnesses among about 171 workers: 6.0 per 100 full-time workers, against a median of 3.6 for its industry. Those cases cost 60 days away from work.
| Site and year | Workers | Cases | Days-away cases | Rate | Industry median |
|---|---|---|---|---|---|
| 161_410 East Hartford · 2025 | 171 | 13 | 7 | 6.0 | 3.6 |
| United Steel Inc. East Hartford · 2023 | 185 | 23 | 8 | 10.2 | 3.6 |
Included with any plan: 8 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
See plansEmployers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 7 reports on file, the 6 most recent shown.
Sep 18, 2023, East Hartford: Hospitalization · crushing injuries · multiple foot (feet) locations
On September 18, 2023, an employee's foot was struck by approximately 2,000 pounds of steel. The employee's foot and toes were crushed and the employee was hospitalized.
May 25, 2023, Farmington: Hospitalization · fractures and other injuries, n.e.c. · head and trunk
An employee was walking on a steel beam when they fell 14-feet, resulting in multiple fractures to the head, back, and clavicle, as well as a collapsed lung.
May 23, 2023, East Hartford: Amputation · amputations · fingertip(s)
An employee was using a knife to cut a hose on welding equipment to investigate a leak. The knife amputated one of his fingertips without bone loss.
Apr 3, 2023, East Hartford: Hospitalization · fractures · lower leg(s)
An employee was preparing to cut pipes with a portable band saw. He undid the tie wire and leaned one end of a 20-foot long pipe on a removable rail. As he went to move the pipe, a different rail was knocked over. The rail fell onto the employee and struck his left leg, resulting in a left tibia/fibula fracture.
Oct 6, 2020, East Hartford: Amputation · amputations · fingertip(s)
An employee was using a concrete mixer that was attached to a skid steer and amputated the tip of his right index finger.
Aug 3, 2016, Stamford: Hospitalization · soreness, pain, hurt-nonspecified injury · arm(s), unspecified
On or about August 3, 2016, the wire rope on a rigging system broke, allowing a hinge pin to fall about 20 to 30 feet and strike an employee's left arm.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.106(d)(4)(i)
(4) Design and construction of inside storage rooms—(i) Construction. Inside storage rooms shall be constructed to meet the required fire-resistive rating for their use. Such construction shall comply with the test specifications set forth in Standard Methods of Fire Tests of Building Construction and Materials, NFPA 251-1969. Where an automatic sprinkler system is provided, the system shall be designed and installed in an acceptable manner. Openings to other rooms or buildings shall be provided with noncombustible liquid-tight raised sills or ramps at least 4 inches in height, or the floor in the storage area shall be at least 4 inches below the surrounding floor. Openings shall be provided with approved self-closing fire doors. The room shall be liquid-tight where the walls join the floor. A permissible alternate to the sill or ramp is an open-grated trench inside of the room which dra
29 CFR 1910.106(d)(4)(iv)
(iv) Ventilation. Every inside storage room shall be provided with either a gravity or a mechanical exhaust ventilation system. Such system shall be designed to provide for a complete change of air within the room at least six times per hour. If a mechanical exhaust system is used, it shall be controlled by a switch located outside of the door. The ventilating equipment and any lighting fixtures shall be operated by the same switch. A pilot light shall be installed adjacent to the switch if Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), are dispensed within the room. Where gravity ventilation is provided, the fresh air intake, as well as the exhaust outlet from the room, shall be on the exterior of the building in which the room is located.
29 CFR 1910.106(d)(4)(v)
(v) Storage in inside storage rooms. In every inside storage room there shall be maintained one clear aisle at least 3 feet wide. Containers over 30 gallons capacity shall not be stacked one upon the other. Dispensing shall be by approved pump or self-closing faucet only.
Alert subscribers get notified of each newly cited employer in Connecticut the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.